Exposed RTD Element Sensor Design 3 WIre Pt100 with 48 Inch Long Leads and Connector
Evosensors
$50.00
SKU: P3A-TF22-26S-PX-0.08-PFXX-48-MPCT
![](https://images-async.olark.com/status/5823-593-10-6228/image.png?online=https://cdn.shopify.com/s/files/1/1679/4593/files/george_tech_support_icon.jpg?11070141018481054335&offline=https://cdn.shopify.com/s/files/1/1679/4593/files/george_tech_support_icon.jpg?11070141018481054335)
Exposed RTD Element Sensor Design 3 WIre Pt100 with 48 Inch Long Leads and Connector
- The RTD Sensor is a 3 Wire Pt100 design with an exposed thin film RTD element and 48 Inches (4 ft) of 3 Conductor Nickel Plated Plastic Fluoropolymer (PFA) insulated 26 gage stranded lead wire with a 3 pin Male Miniature Connector attached.
- The RTD sensor assembly has a -90 to 500 F (-70 to 260 C) temperature operating range and RTD element is Class A thin film design
- The exposed sensor to cable connection is encased with a 500 F rated epoxy potting compound to insulate and further reinforce the transition area.
- The wire has a 500 F (260C) temperature insulation rating, it is a twisted construction and an overall nominal diameter of .072”.
- The 3-wire design provides a higher level of temperature measurement accuracy as compared to a 2-wire design. The sensors immunity from electrical interference and fast response with the exposed element is perfect for Power Electronics, Transformers, and Motor applications.
- EvoSensors Part Number - P3A-TF22-26S-PX-0.08-PFXX-48-MPCT
Complete your RTD Temperature Sensor System with the following Products
Need Help? 407-420-8080
email: info@evosensors.com
email: info@evosensors.com