Temperature Probes, Sensors and Components - Items tagged as "50ft-long-leads"
A Temperature Probe or Temperature Sensors detects and measures the heat and or coolness of an object or environment (air, gas, liquid, flame, solid) and used to monitor or control temperature.
Some of the most utilized temperature probes are as follows.
- Thermocouples - provide a very wide temperature range -454°F to 4,200°F (-270 to 2315°C), they can be larger rugged designs or micro sized to provide fast response and precision placement.
- RTD (Resistance Temperature Device) -typically have a temperature range of -320F to 1,562 F (-196 to 850 C). The utilization of RTD probes is significantly increasing due to thier high level of accuracy, stability and being interchangable.
- Infrared Temperature Measurement provides fast non contact temperture measurement and growing use of thermal imaging has increased the overall utilization
- Thermistors are know for high accuracy in narrow temperture ranges and economically priced in high quantities
View all
.620" Wide x 1" Long Patch
0-08-inches-long
0-16-inches-long
0-25-inches-long
0-5-inches-long
0-51-inches-long
0-94-inches-long
0.5-Meters-Long
0.62-Inches-Long
0.79 Inches Long
010-inch-dia
020-inch-dia
032-inch-dia
040-inch-dia
062-inch-dia
1-2-npt-fitting
1-2-npt-fitting-spring-loaded
1-2-npt-process-connect-1-2-npt-sensor-connect
1-2-npt-process-connect-3-0-mm-sensor-connect
1-2-npt-ss-fitting
1-25-inch-l-x-250-circular
1-4-npt-fitting
1-4-npt-ss-fitting
1-5-inches-long
1-8-npt-fitting
1-8-npt-ss-fitting
1-inch
1-inch-circular-flange-and-tube
1-inch-l-x-750-inch-wide
1-inch-long
1-inch-long-x-500-inch-wide
1/2" Inch-Long
1/2-260S-U41/2-304SS
10-inches-long
10-meters
100-inches
100-inches-long
1000ft
100ft
108-inches
108-inches-(9ft)long
10ft
11-inches-long
118-inch-dia
12-inches
12-inches-long
120-inches
120-inches-10ft-long
1200-Inches-100ft
125-inch-dia
14-inches
144-Inches-12-Ft
165-inches-long
176-inches
18-inches
18-inches-long
180-inches
188-inch-dia
192-inches
196-inches-16ft
197-inches-5-meters
2-5-inch-insertion
2-inch-long-1-inch-wide
2-inches
2-inches-long
2-Point-Temperature Calibration
2-Wire-RTD-Cable
2-wire-rtd-pt1000
2.5-inches-long
20 Inches Long
20-awg-pair
20-awg-pair-060-x-095-inch-dia
20-gage-beaded-thermocouples-500-f-260-c-pfa-insulation
20-gage-beaded-thermocouples-with-500-f-260-c-pfa-insulation
20-gage-solid-thermocouple-wire-900°F(480°C)-fiberglass-insulation
20-gage-thermocouple-wire-with-ceramic-fiber-insulation
20-gage-thermocouple-wire-with-fiberglass-insulation
20-gage-thermocouple-wire-with-pfa-insulation
20-inches
200-inches
200ft
200m
216-inches-18-ft
22-gage
22-gage-stranded-rtd-wire
22-gage-stranded-rtd-wire-fep-insulated
24 Gage Solid Thermocouple WIRE 900 F (482 C) Fiberglass Insulation
24-awg-pair-050-x-075-inch-dia
24-awg-pair-050-x-080-inch-dia
24-awg-pair-050-x-086-inch-dia
24-awg-pair-056-x-093-inch-dia
24-awg-pair-063-x-102-in-dia
24-awg-pair-090-x-125-inch-dia
24-awg-pair-110-max-inch-dia
24-gage-bare-wire-thermocouple-020-inch-diameter
24-gage-stranded-thermocouple-and-rtd-wire
24-inches
24-inches-long
240 Inches Long
240-inches-20ft
24s-awg-3-wire-097-inch-dia
250-inch-dia
250ft
25ft
26-gage-rtd-wire-pfa-insulated
26s-awg-2-wire-068-inch-dia
26s-awg-3-wire-072-inch-dia
26s-awg-3-wire-072-inch-dia 1
26s-awg-3-wire-contruction-072-inch-dia
26s-awg-4-wire-082-inch-dia
2ft
3-8-npt-ss-fitting
3-inches
3-inches-long
3-Point-Temperature-Calibration
3-wire-rtd-pt100
3-wire-rtd-pt1000
30-awg-pair-035-x-058-inch-dia
30-awg-pair-037-x-050-inch-dia
30-awg-pair-040-x-055-inch-dia
30-gage-010-diameter-thermocouple-wire-with-500f-260c-pfa-insulation
30-gage-bare-wire-sensor-010-inch-diameter
30-gage-thermocouple-wire-with-fiberglass-insulation
30-gage-thermocouple-wire-with-pfa-insulation
30-inches-long
300-inches-25-ft
304-ss-thermowell
312-inch-l-x-250-wide
312-inch-long-500-inch-wide
316ss-thermowell
316ss-tube
36-awg-pair-019-x-030-inch-dia
36-awg-pair-033-x-045-inch-dia
36-gage-005-pfa-insulated-thermocouple-beads
36-gage-bare-wire-thermocouple-005-inch-diameter
36-Gage-Fiberglass-Insulated-Thermocouple
36-gage-thermocouple-wire-with-pfa-insulation
36-inches
36-inches-long
360-inches-30-ft
396-Inches- 10-meters-(33-ft)
4 Pole Screw Terminal Connection Block
4-5-inch-insertion
4-inches
4-inches-long
4-mm diameter
4-wire-pt1000
4-wire-rtd-pt1000
4.5-Inches
40 Inches Long
40-awg-pair-017-x-026-inch-dia
40-gage-bare-wire-thermocouple-003-inch-diameter
40-inches
420-inches-35-ft
48-inches
48-inches-long
480-inches-40-ft
5-inches-long
5-Meters
5-Pack
5/8-(0.625")-Inches-Long
50-inch-long-wire-thermocouple
50-mm-insertion
500ft
50ft
50ft-long-leads
5srtc-gg-k-20-36
5srtc-gg-k-20-72
5SRTC-GG-K-24-120
5srtc-gg-k-24-36
5srtc-gg-k-24-72
5SRTC-GG-K-30
5SRTC-GG-K-30-120
5SRTC-GG-K-30-36
5SRTC-GG-K-30-50
5srtc-gg-k-30-72
5SRTC-GG-K-36
5SRTC-GG-K-36-120
5SRTC-GG-K-36-240
5SRTC-GG-K-36-50
5srtc-gg-t-30-120
5srtc-gg-t-30-36
5srtc-gg-t-30-72
5srtc-tt-j-30-72
5srtc-tt-k-20-36
5srtc-tt-k-20-72
5srtc-tt-k-24-36
5srtc-tt-k-24-72
5srtc-tt-k-30-36
5srtc-tt-k-30-72
5srtc-tt-k-36-36
5srtc-tt-k-36-72
5srtc-tt-k-40-36
5srtc-tt-k-40-72
5srtc-tt-t-20-36
5srtc-tt-t-20-72
5srtc-tt-t-24-36
5srtc-tt-t-24-72
5srtc-tt-t-30-36
5srtc-tt-t-30-72
5SRTC-TT-T-36-36
5SRTC-TT-T-36-72
5SRTC-TT-T-40-36
5SRTC-TT-T-40-72
5tc-gg-j-20-36
5tc-gg-j-20-72
5tc-gg-j-24-72
5tc-gg-j-30-40
5tc-gg-j-30-72
5tc-gg-k-20-36
5tc-gg-k-20-72
5tc-gg-k-24-36
5tc-gg-k-24-72
5tc-gg-k-30-36
5tc-gg-k-30-72
5tc-gg-k-36-36
5tc-gg-k-36-72
5TC-KK-K-30-36
5TC-PVC-K-24-180
5TC-PVC-T-24-180
5TC-TT-E-30-36
5tc-tt-j-20-36
5tc-tt-j-24-36
5tc-tt-j-24-72
5tc-tt-j-30-36
5tc-tt-j-30-72
5tc-tt-j-36-36
5tc-tt-j-36-72
5TC-TT-K-20-36
5tc-tt-k-20-72
5tc-tt-k-24-144
5tc-tt-k-24-36
5tc-tt-k-24-48
5tc-tt-k-24-72
5tc-tt-k-30-120
5tc-tt-k-30-36
5TC-TT-K-30-48
5tc-tt-k-30-72
5TC-TT-K-36-120
5TC-TT-K-36-36
5tc-tt-k-36-72
5tc-tt-k-40-36
5tc-tt-k-40-72
5TC-TT-T-20-180
5tc-tt-t-20-36
5tc-tt-t-20-72
5tc-tt-t-24-36
5tc-tt-t-24-72
5tc-tt-t-30-12
5tc-tt-t-30-36
5tc-tt-t-30-72
5TC-TT-T-36-12
5tc-tt-t-36-36
5tc-tt-t-36-72
5tc-tt-t-40-36
5tc-tt-t-40-72
6-inches
6-inches-long
60-inches
600-Inches
600-inches-50-ft
7-inches-long
7-strands-of-32-awg-wire
7-strands-of-34-awg-wire
7.5-inches-long
72-inches
8-inches
8-inches-long
80-inches
80-inches-long
804-7892
84-inches-7ft-long-wire-leads
9-Inches
9-inches-long
900-inches-75-ft
96-inches
96-inches-long-8ft
ACCSMIAC
ACCSUSBK
air-ss-fitting
air-temperature-probe
air-temperature-rtd-probe
aluminum-flip-top-head
aluminum-flip-top-head-and-spring
bare-wire-thermocouples
beaded-wire-sensor
beaded-wire-thermocouples-with-miniature-connectors
bolt-down-rtd
brass-1-4-npt-to-1-4-inch-probe
brass-1-4-npt-to-1-8-inch-probe
brass-1-8-npt-to-1-8-inch-probe
brass-compression-fitting
brass-thermowell
c
CAIN-116U-12-DUAL
CAIN-14U-12-DUAL
calibrated-thermocouples
CASS-116G-12-PFA
CASS-14U-6
CASS-18U-12-DUAL
CASS-18U-12-NHX
cast-iron-head
ceramic-fiber-ins-wire-with-inconel-braid
ceramic-insulated-thermocouples
ceramic-or-silica-fiber-insulated-thermocouple-wire
CMJ-KAPF
co1 k
CO1-K-72 INCH
CO3-K
CO3-K-72
Compact Fixed Mount Infrared Thermometer
compression-fitting-and-wire-leads
connector-extension-cable-mini-male-female
connector-extension-cable-mini-three-pin-male-female
connectors-and-fittings
CONV033
CONV353
CPSS-18G-12-PFA
cryogenic-rtd
CSJT-UI
custom lengths
cyrogenic-rtd
DTC-K-F
DTC-K-M
dual-thermocouple-probe-with-standard-size-connectors
e
element-and-wire
emissions
engine-technology
EQSS-18U-6
exposed
exposed-element-with-stripped-wire-leads
exposed-epoxy
EXPP-J-24S
Extension-Grade-Thermocouple- Wire
fast-response-RTD-sensor
FEP-Insulated-Extension-Grade-Thermocouple-Wire
FF-J-24-1000
FF-J-24S-TWSH-1000
FF-K-24-TWSH-1000
FF-K-24S-TWSH-1000
fiberglass-ins-wire
fiberglass-insulated-thermocouple-wire-24-gage-solid-900-f-rating
fiberglass-on-k-wire
Fiberglass-on-RS-Wire
field-cuttable-with-wire-leads
flanged-probe
flat-aluminum-fitting
flat-pin
flat-weld-bead
G 1/8 Fitting
GG-K-20-1000
grounded
Handheld Thermometer
handheld-thermocouple-probes
Hermetically-Sealed-Flexible-RTD-Sensor-Probes
hermetically-sealed-tip-with-stripped-wire-leads
high-temperature-thermocouple
highest-temperature-thermocouple
hmp-k-f
Hot-dog-and-Sausage-Probe
ICSS-116G-12-PFA
ICSS-116G-18-PFA
ICSS-18G-12-PFA
ICSS-18G-18-PFA
iec-100-ohm
iec-color-code
inconel-600
industrial-probe
infrared
Infrared Temperature
Infrared Temperature Sensor and Transmitter - Compact Fixed Mount Design
Infrared Temperature Sensors
Infrared Thermometers Pyrometers
infrared-camera
infrared-temperature-sensor-accessories
j
j-calibration-tc-wire
j-fast-response
JMQSS-062G-3
JMQSS-062G-6
JMQSS-062U-6
JMQSS-125G-3
JMQSS-125G-4
JMQSS-125U-6
JP-E-F
JP-K-F
JQIN-18U-12
JQSS-18G-12
JQSS-18G-18
JQSS-18G-3
JQSS-18U-6
JQSS-316U-12
k
k-calibration-tc-wire
k-dual
k-fast-response
kapton-ins-wire
KMQIN-040U-24
KMQIN-062E-12
KMQIN-062G-3
KMQIN-062G-6
KMQIN-062U-12
KMQIN-062U-24
KMQIN-062U-3
kmqin-125U-165
KMQSS-020G-12
KMQSS-020G-6
KMQSS-040G-6
KMQSS-040U-12
KMQSS-040U-6
KMQSS-062E-12
kmqss-062g-12
kmqss-062u-18
KMQSS-062U-24
kmqss-062u-6
KMQSS-116E-18
KMQSS-125E-6
KMQSS-125G-6
KMQSS-125U-12
KMQSS-125U-18
KMQSS-125U-3
kmqss-125u-4
kmqss-125u-6
KQIN-18U-18
KQIN-18U-6
KQSS-116U-18
KQSS-14U-6
KQSS-18U-12
KQSS-18U-18
KQSS-18U-36
KQSS-18U-6
KQSS-316U-12
LJ-C
LJ-E
LJ-J
LJ-K
LJ-N
LJ-R/S
LJ-RS
LJ-T
LJ-U
LP-K
M12-and-other-circular-RTD-connectors
m12-four-pin-female
m12-four-pin-male
m12-metal-circ-conn-npt-fitting-and-spring
m12-metal-circular-conn-and-npt-fitting
m12-metal-circular-connector
m12-plastic-circular-conn-and-npt-fitting
m12-plastic-circular-connector
m12-plastic-conn-npt-fitting-and-transmit
M12-R-M
M12-S-M
M12C
metal-transition-to-lead-wire
metal-transition-with-lead-wire
mi-cable-probe
mine-tailings
Mini Brass Crimp Adapter 3.0MM Probe
Mini Brass Crimp Adapter .125 Probe
Mini Plastic C
Mini Plastic Co
Mini Plastic Conn
Mini Plastic Conne
Mini Plastic Connector Thre
Mini Plastic Connector Three
mini-2-pin-connector-rubber-boot
mini-3-pin-connector-rubber-boot
mini-bolt-down-aluminum-fitting-wire-and-conn
mini-brass-crimp-adapter-020-probe
mini-brass-crimp-adapter-032-probe
mini-brass-crimp-adapter-040-probe
mini-brass-crimp-adapter-063-probe
mini-brass-crimp-adpater-1-5mm-probe
mini-ceramic-connector
mini-ceramic-connector-wire-clamp
mini-connector-locking-clip-plate
mini-connector-strain-relief
mini-connector-wire-clamp
mini-dual-connector-wire-clamp
mini-grommet-for-20-awg-and-larger
mini-grommet-for-24-awg
mini-grommet-for-30-awg-and-smaller
mini-high-temperature-rubber-boot
mini-male-3-pin-plastic-connector
mini-male-ceramic-connector
mini-male-dual-connector
mini-male-hi-temp-plastic-connector
mini-male-plastic-connector
mini-plastic-connector
mini-plastic-connector-three-pin
mini-ss-crimp-adapter-040-probe
mini-ss-crimp-adapter-063-probe
mini-ss-crimp-adapter-125-probe
mini-ss-crimp-adapter-3-0mm-probe
mini-ultra-high-temperature-connector-wire-clamp
mini-wire-insert-for-20-awg
mini-wire-insert-for-24-awg
mini-wire-insert-for-30-awg
Miniature Infrared Temperature Sensors
Miniature Steel Hex fitting with Wire and Conn
miniature-braze-crimp-adapter
miniature-ceramic-female
miniature-ceramic-male
miniature-crimp-adapter
miniature-duplex-female
miniature-duplex-male
miniature-female
miniature-female-thermocouple-connectors-400-f-200-c-rated
miniature-grommet
miniature-high-temperature-female
miniature-high-temperature-male
miniature-locking-clip
miniature-locking-female
miniature-locking-male
miniature-male
miniature-male-plastic-connector
miniature-male-thermocouple-connectors-400-f-200-c-rated
miniature-panel-jack
miniature-panel-mount
miniature-pcb-flat-mounting
miniature-pcb-rear-mounting
miniature-pcb-side-mounting
miniature-protection-boot
miniature-strain-relief
miniature-thermocouple-connector-accessories
miniature-thermocouple-connectors
miniature-three-pin-female
miniature-three-pin-male
miniature-ultra-high-temperature-female
miniature-ultra-high-temperature-male
miniature-wire-clamp-bracket
miniature-wire-insert
miniautre-steel-hex-fitting-with-wire-and-conn
mining
mounting-fittings
MP-U
MPJ-C-F
MPJ-J-F
mpj-k-f
MPJ-T-F
MPJ-U-F
MRBS
MTC-12-FF
mtp-u-f
mtp-u-m
multi-pin
multi-pin-connectors
n
Needle-Point
NHX-C-F
NHX-N-M
NHXH-C-M
no-fitting
npt-fitting-and-wire
npt-fitting-with-wire-and-connector
num-8-32-w-250-hex
OM-CP-OCTPRO
OST-J-M-ROHS
OSTW-C-F
OSTW-C-M
OSTW-E-F
OSTW-J-F
OSTW-J-F-ROHS
OSTW-J-M
OSTW-J-M-ROHS
OSTW-K-F
OSTW-K-M
OSTW-N-F
OSTW-R/S-F
OSTW-RS-F
OSTW-T-F
OSTW-U-F
OTP-K-M
OTP-K-M-ROHS
OTP-U-F
P13R-005
P4A-BDFT-RECX-PK-125H-PFXX-16SWCP
pcb-thermocouple-connectors
PCC-SMP-K-100
PCC-SMP-K-5
PCLM
pfa-and-aluminum-mylar-inner-shield-on-j-wire
pfa-and-aluminum-mylar-inner-shield-on-k-wire
pfa-coated-rtd-probe
pfa-coated-thermocouple-probe
pfa-coated-thermocouple-probe-with-miniature-flat-pin-male-connector
pfa-coated-thermocouple-probes
pfa-plastic-fluoropolymer
pfa-plastic-fluoropolymer-on-j-wire
pfa-plastic-fluoropolymer-on-k-wire
pfa-plastic-fluoropolymer-on-t-wire
Plastic Junction Box
Plastic Tube
plastic-fluoropolymer-ins-single-leads
plastic-fluoropolymer-ins-wire
plastic-fluoropolymer-ins-wire-ss-braid
plastic-fluoropolymer-insulated-wire
plastic-fluorplymr-ins-wire-and-ss-armor
plastic-fluorplymr-ins-wire-with-ss-braid
polyimide-glass-reinforced-tape
PR-10-2-100-1/4-3-E
PR-10-2-100-1/4-4-E
PR-10-2-100-1/4-5-E
PR-10-2-100-1/4-6-E
PR-10-2-100-1/8-3-E
PR-10-2-100-1/8-4-E
PR-10-2-100-1/8-6-E
PR-10L-3-100-1/4-6
PR-10L-3-100-1/8-2
PR-10L-3-100-1/8-6-300
PR-10L-3-100-3/16-6
PR-10L-4-100-1/8-3
PR-10L-4-100-1/8-6
PR-11-2-100-1/4-3-E
PR-11-2-100-1/4-6-E-BX
PR-11-2-100-1/4-9-E
PR-11-2-100-1/8-6-E
PR-11-2-100-1/8-6-E-240
PR-11-2-100-3-16-6-E
PR-12E-3-100-1/4-18
PR-12L-3-100-1/4-18
PR-13-2-100-1/8-6-E
PR-13L-3-100-1/4-6
PR-20
PR-20-2-100-1/4-2-E-T
PR-20-2-100-1/8-2-E-T
PR-20-3-100-1/8-2-E-T
PR-21
PR-22
PR-22-3-100-A-1/4-0600-M12
PR-22-3-100-A-1/4-1200-M12
PRCTL-2-100-A-1/4-24-40
PRCTL-3-100-A-1/4-24-40
probe
probe-fitting
PRTF
PRTF-10-2-100-1/8-4-E
PRTF-10-2-100-1/8-6-E
Pt100 - 4 wire Class B
pt100-2-wire-class-b
pt100-3-wire-class-a
pt100-3-wire-class-b
pt100-4-wire-class-a
pvc-ins-wire
Round-Mounting-Flange
round-pin
rs
RSCCSTCLT15
rtd
RTD Probes
RTD Pt100 Air Temperature Sensors and Probes
RTD-1-F3105-36-T
RTD-2-F3105-36-T
RTD-2-F3105-36-T-OTP
rtd-3-f3105
RTD-3-F3105-36-T
RTD-805
rtd-830
RTD-830-4WIRE
rtd-830-mtp
rtd-831-mtp
RTD-850
rtd-connector
rtd-connector-wire-cable
rtd-connectors
RTD-Extension-Wire 26S -AWG-3-Wire-Design- .072"-Diameter
rtd-instruments
rtd-miniature-flat-pin
RTD-NPT-72-E
RTD-NPT-72-E-1/4
rtd-probe-with-pfa-lead-wire
rtd-probes-with-900f-fiberglass-leads
rtd-probes-with-connectors
rtd-probes-with-fittings
RTD-Probes-with-Stainless-Steel-Braid-over-PFA-Leads
rtd-sensors
rtd-standard-round-pin
rtd-wire
rtd-wire-24s-awg-3-wire-design-098-diameter
rtd-wire-400-f-rated-fep-insulation
rtd-wire-400F-rated-FEP-insulation
rtd-wire-500f-rated-pfa-insulation
RTDM12
RTDM12 RTD Sensor with M12 Connector
RTDM12-G1/8-3MM-24MM-A
SA1-J
SA1-J-120-SC
SA1-J-120-SRTC
SA1-J-72
SA1-J-SRTC
SA1-K
SA1-K-120-SRTC
SA1-K-180
SA1-K-72
SA1-K-72-SRTC
SA1-K-SRTC
SA1-K-SRTC-120
SA1-RTD
Sa1-rtd-120
SA1-RTD-240
SA1-RTD-360
SA1-RTD-4W
SA1-RTD-4W-120
SA1-RTD-4W-80
SA1-RTD-4W-80-ROHS
SA1-RTD-80
SA1-RTD-MTP
SA1-Self Adhesive Patch 1 Inch
SA1-T
sa1-t-72
SA1-T-72-SRTC
SA1-T-SRTC
SA1XL - Self Adhesive 1 inch Patch Xtra Line
SA1XL-J
SA1XL-J-72
sa1xl-k
SA1XL-K-120
SA1XL-K-120-SRTC
SA1XL-K-72
SA1XL-K-72-SRTC
SA1XL-K-SRTC
SA1XL-T
SA1XL-T-120
SA1XL-T-120-SRTC
SA1XL-T-72-SRTC
SAS-TRJE-4-36
SB-SMP-CR062
SCAIN-020G-6
SCAIN-032U-12
SCAIN-062U-12
SCAIN-062U-18
SCASS-020G-12
SCASS-020G-6
SCASS-020U-12
SCASS-032U-6
SCASS-062U-12-SHX
SCASS-062U-6-DUAL
SCASS-125U-6-DUAL
self-adhesive-patch-and-wire
self-adhesive-patch-with-wire-and-connector
self-adhesive-patch-with-wire-leads
shielded-thermocouples
shx-c-f
SHX-C-M
SHX-E-F
SHX-E-M
SHX-J-F
SHX-J-M
SHX-K-F
SHX-K-M
SHX-N-F
SHX-N-M
SHX-RS-F
SHX-RS-M
SHX-T-F
SHX-T-M
SHX-U-F
SHX-U-M
SMPW-C-F
SMPW-C-M
SMPW-CC-K-M
SMPW-J-F
SMPW-J-M
SMPW-K-F
SMPW-K-F-ROHS
SMPW-K-M
SMPW-K-M-ROHS
SMPW-K-MF
SMPW-KI-F
SMPW-N-F
SMPW-N-M
SMPW-R/S-F
SMPW-R/S-M
SMPW-T-M
SMPW-T-M-ROHS
SMPW-U-F
SMPW-U-F-ROHS
SMPW-U-M
SMPW-U-M-ROHS
SMPW-U-MF
SMTS-TC-036-U-K-N
solid-wire
solid-wire-twisted
spade-lug-wire-lead
SPJ-E-F
SPJ-J-F
SPJ-K-F
spring-loaded-rtd-probes-with fittings
spring-loaded-rtd-probes-with-fittings
ss-cage-housing-with-wire-and-connector
SSLK-18-18
SSP-RTD-PT100
stainless steel-1-4-npt-to 3-16-inch
stainless steel-1-8-npt-to 3-16-inch
stainless-steel-1-4-npt-to-1-4-inch-probe
stainless-steel-1-4-npt-to-1-8-inch-probe
stainless-steel-1-8-npt-to-1-8-inch-probe
stainless-steel-304
stainless-steel-316
stainless-steel-compression-fitting
stainless-steel-compression-fitting-1-2-npt-to-1-4-inch-probe
stainless-steel-compression-fitting-1-2-npt-to-3-mm-probe
stainless-steel-compression-fitting-1-4-bspt-to-1-4-probe
stainless-steel-compression-fitting-1-4-npt-for-3-16-inch-probe
stainless-steel-compression-fitting-1-4-npt-to-3-mm-probe
stainless-steel-compression-fitting-1-8-npt-to-1-16-probe
stainless-steel-compression-fitting-stainless-steel-1-8-npt-to-3-16-inch-probe
stainless-steel-tube-with-wire-leads
standard
standard-2-pin-connector-rubber-boot
standard-3-pin-connector-rubber-boot
standard-brass-crimp-adapter-063-probe
standard-brass-crimp-adapter-125-probe
standard-brass-crimp-adapter-187-probe
standard-brass-crimp-adapter-250-probe
standard-brass-crimp-adpater-3-0-mm-probe
standard-braze-crimp-adapter
standard-ceramic-connector-tube-adapter-for-125-probe
standard-ceramic-connector-tube-adapter-for-250-probe
standard-ceramic-connector-wire-clamp
standard-ceramic-female
standard-ceramic-male-hollow-pins
standard-ceramic-male-solid-pins
standard-connector-strain-relief
standard-connector-tube-adapter-for-063-probe
standard-connector-tube-adapter-for-125-probe
standard-connector-tube-adapter-for-187-probe
standard-connector-tube-adapter-for-250-probe
standard-connector-wire-clamp
standard-crimp-insert
standard-dual-connector-wire-clamp
standard-duplex-female
standard-duplex-male
standard-female
standard-grommet
standard-grommet-for-18-awg-and-larger
standard-grommet-for-20-awg
standard-grommet-for-24-awg
standard-high-temperature-female
standard-high-temperature-male
standard-locking-clip
standard-male
standard-male-3-pin-plastic-connector
standard-male-ceramic-connector
standard-male-dual-connector
standard-male-hi-temp-plastic-connector
standard-male-plastic-connector
standard-panel-insert-flanged
standard-panel-jack
standard-plastic-connector
standard-protection-boot
standard-size-male-ceramic
standard-ss-crimp-adapter-063-probe
standard-ss-crimp-adapter-125-probe
standard-ss-crimp-adapter-187-probe
standard-ss-crimp-adapter-250-probe
standard-ss-crimp-adpater-3-0-mm-probe
standard-strain-relief
standard-thermocouple-connector-accessories
standard-thermocouple-connectors
standard-three-pin-female
standard-three-pin-male
standard-tube-adapter
standard-ultra-high-temperature-connector-wire-clamp
standard-ultra-high-temperature-female
standard-ultra-high-temperature-male
standard-wire-clamp-bracket
standard-wire-insert
standard-wire-insert-for-20-awg
standard-wire-insert-for-24-awg
std-plastic-connector-three-pin
std-plug-1200-f-650-c-max-rating-with-solid-pins
stripped-ends
stripped-wire-leads
surface-probe
surface-rtd-with-non-sdhesive-surface-patch
surface-thermocouple-probes
surface-thermocouple-with-non-adhesive-patch
surface-thermocouples-bolt-on-design
t
t-calibration-tc-wire
t-fast-response
T5R-003-12
T5R-005-12
T5R-010-12
T5R-020-12
T5R-020-18
T5R-020-24
tailings
TAS-E-2
TAS-E-3
TAS-J-2
TAS-J-3
TAS-K-1
TAS-K-2
TAS-K-3
TAS-K-4
TAS-T-2
TAS-T-3
tc-connectors
tc-mi-cable-probe
tc-surface-probe
Thermal Imager
thermocouple
thermocouple extension cable with female connector and stripped leads
thermocouple-adapters
thermocouple-and-rtd-sensors-with-stripped-wire-ends
thermocouple-connector
thermocouple-connectors
Thermocouple-Connectors- 4-Prong
Thermocouple-Connectors- 4-Prong-Dual-Circuit
thermocouple-extension-cable-with-miniature-male-connector
thermocouple-extension-cables
thermocouple-extension-cables-and-connector-assemblies-with-stripped-ends
thermocouple-extension-wire
thermocouple-meters
thermocouple-panel-jacks
thermocouple-probes
thermocouple-probes-with-900°F-fiberglass-rated-leads
thermocouple-probes-with-lead-wire-and-miniature-plastic-connector
thermocouple-probes-with-miniature-connectors
thermocouple-probes-with-transition-to-fiberglass-lead-wire
thermocouple-probes-with-transition-to-lead-wire-with-stripped-ends
thermocouple-wire-with-stainless-steel-braid
Thermocouples-with-20-Gage-Fiberglass-Insulated-Leads
thermowell
THMC-SJ
THME-SJ
THMJ-SJ
THMK-SJ
THMK-SP
THMN-SJ
THMT-SJ
THMU-SJ
threaded-probe
threaded-ss-fitting
threaded-thermocouple
TJ300-CASS-18U-12
TJ36-CAIN-18U-6-CC-XCIB
TJ36-CASS-116G-6-SB-SMPW-M
TJ36-CASS-116U-12
TJ36-CASS-116U-12-SMPW-M
TJ36-CASS-116U-6-SB-SMPW-M
TJ36-CASS-116U-6-SMPW-M
TJ36-CASS-14U-6-SB-SMPW-M
TJ36-CASS-18G-12-SB-SMPW-M
TJ36-CASS-18U-12
TJ36-CASS-18U-6
TJ36-CASS-18U-6-SB-SMPW-M
TJ36-CPSS-116U-6
TJ36-CPSS-116U-6-SMPW-M
TJ36-CPSS-18U-3
TJ36-ICSS-14U-12
TJ36-ICSS-14U-6
TJ36-ICSS-14U-6-SMPW-M
TJ36-ICSS-18U-6-SB
TJ36-ICSS-316E-4
TJ72-CPSS-116U-6
TMQSS-062G-6
TMQSS-062U-3
TMQSS-062U-6
TMQSS-125G-6
TMQSS-125U-6
TMQSS-18U-3
TQSS-18U-12
TQSS-18U-4
TQSS-18U-6
TRC#P1
TRC#P1A2X
TRC#P1B2X
TRM-P1B-3--0100X
TT-J-24-1000
TT-J-30-1000
TT-K-40-1000
TT-T-30-1000
Twisted-Shielded-Thermocouple-Wire
Type C Thermocouple Connector
Type C Thermocouple Extension Wire
type-b-thermocouples
type-c-thermocouple-wire
type-e-thermocouples
type-j-dual-thermocouple
type-j-thermocouple-extension-wire
type-j-thermocouple-wire
type-k-thermocouple-probes-with-miniature-connectors
type-n-thermocouple-wire
type-rs-thermocouple-extension-wire
u
u-thermocouple
uncompensated-nickel-plated-copper-wire
ungrounded
ushx-c-f
ushx-c-m
UX-18527-84
wire-bead-weld
wire-tc-and-rtd
wire-tc-and-rtd-products
WTJ-HD-72-S





