Pt100 RTD - Items tagged as "50ft-long-leads"
Pt100 is a platinum based RTD (resistance temperature detector) with 100 ohm output at 0°C and a 0.385 change per degree C.
-
Pt100 Temperature Sensors typically have Higher Accuracy and Stability than thermocouples or infrared temperature sensors.
- Temperature range of -328 (-200°C) Cryogenic through 1,562°F (850°C).
- RTD sensors can have a slower temperature response time.
-
RTD Pt100 elements are commonly encased in a metal tube or fitting to protect the sensing element itself. The elements are primarliy made in 2 designs.
- A Thin film ceramic chip is the most utlized design, where the platinum is deposited onto the alumina (ceramic) substrate and 100 ohm resistance pattern is created through photolithography, etching and laser trimming.
- Wire-wound elements has a fine diameter platinum wire is wrapped and fused inside a glass casing or embedded in ceramic.
- Exposed Pt100 (RTD) sensor assemblies can provide a 5 times Faster Temperature Response as compared to designs encased in a probe.
-
Lead Wire construction can be 2, 3 or 4 wire designs.
- The 3 wire is the most common design, the 4 wire configuration can provide additional accuracy.
- 2 wire designs can have lower accuracy with lead wire adding resistance and more commonly used with Pt1000 ohm element.
-
Pt100's are also relatively immune to electrical noise and can be used in industrial environments, around motors, generators and other high voltage equipment.
- Additional electrical immunity can be achieved with shielding and ground wire designs.
- The Filter Search Tool on the ← Left of the page provides the opportunity to quickly select the RTD product details best suited for your application.
View all
.620" Wide x 1" Long Patch
0-08-inches-long
0-16-inches-long
0-5-inches-long
0-51-inches-long
0-94-inches-long
0.62-Inches-Long
0.79 Inches Long
1-2-npt-fitting
1-2-npt-fitting-spring-loaded
1-2-npt-ss-fitting
1-25-inch-l-x-250-circular
1-4-npt-fitting
1-4-npt-ss-fitting
1-5-inches-long
1-8-npt-fitting
1-8-npt-ss-fitting
1-inch-circular-flange-and-tube
1-inch-l-x-750-inch-wide
1-inch-long
1/2" Inch-Long
10-inches-long
100-inches
1000ft
100ft
108-inches
11-inches-long
118-inch-dia
12-inches
12-inches-long
120-inches
1200-Inches-100ft
125-inch-dia
144-Inches-12-Ft
176-inches
18-inches
18-inches-long
180-inches
188-inch-dia
192-inches
196-inches-16ft
197-inches-5-meters
2-inch-long-1-inch-wide
2-inches-long
2-Wire-RTD-Cable
2-wire-rtd-pt1000
2.5-inches-long
200ft
24-gage-stranded-thermocouple-and-rtd-wire
24-inches
24-inches-long
240 Inches Long
240-inches-20ft
250
250-inch-dia
25ft
26-gage-rtd-wire-pfa-insulated
26s-awg-2-wire-068-inch-dia
26s-awg-3-wire-072-inch-dia
26s-awg-3-wire-072-inch-dia 1
26s-awg-3-wire-contruction-072-inch-dia
26s-awg-4-wire-082-inch-dia
3-8-npt-ss-fitting
3-inches-long
3-wire-rtd-pt100
3-wire-rtd-pt1000
300-inches-25-ft
312-inch-l-x-250-wide
312-inch-long-500-inch-wide
316ss-tube
32208550 - Yageo-Nexensos
32208572 Yageo Nexensos
36-inches
360-inches-30-ft
396-Inches- 10-meters-(33-ft)
4 Pole Screw Terminal Connection Block
4-inches-long
4-mm diameter
4-wire-pt1000
4-wire-rtd-pt1000
4.5-Inches
40 Inches Long
40-inches
420-inches-35-ft
48-inches
480-inches-40-ft
5-inches-long
5-Meters
5/8-(0.625")-Inches-Long
500ft
50ft
50ft-long-leads
6-inches
6-inches-long
60-inches
600-inches-50-ft
7-inches-long
7-strands-of-34-awg-wire
7.5-inches-long
72 Inches Long
72-inches
8-inches
8-inches-long
80-inches
84-inches-7ft-long-wire-leads
9-Inches
9-inches-long
900-inches-75-ft
96-inches
air-ss-fitting
air-temperature-probe
air-temperature-rtd-probe
aluminum-flip-top-head
aluminum-flip-top-head-and-spring
bolt-down-rtd
cast-iron-head
compression-fitting-and-wire-leads
connector-extension-cable-mini-male-female
connector-extension-cable-mini-three-pin-male-female
connectors-and-fittings
CONV033
CONV353
cryogenic-rtd
CSJT-UI
cyrogenic-rtd
element-and-wire
exposed-element-with-stripped-wire-leads
F3105
F3105-A
F3145
fast-response-RTD-sensor
field-cuttable-with-wire-leads
flanged-probe
flat-aluminum-fitting
flat-pin
G 1/8 Fitting
Heraeus-32208499
Heraeus-32208503
Heraeus-32208550
Heraeus-32208572
Heraeus-Part-Number 32208548
Hermetically-Sealed-Flexible-RTD-Sensor-Probes
hermetically-sealed-tip-with-stripped-wire-leads
Hot-dog-and-Sausage-Probe
iec-100-ohm
industrial-probe
LJ-U
M12-and-other-circular-RTD-connectors
m12-four-pin-female
m12-four-pin-male
m12-metal-circ-conn-npt-fitting-and-spring
m12-metal-circular-conn-and-npt-fitting
m12-metal-circular-connector
m12-plastic-circular-conn-and-npt-fitting
m12-plastic-circular-connector
m12-plastic-conn-npt-fitting-and-transmit
M12-R-M
M12-S-M
M12C
metal-transition-with-lead-wire
mi-cable-probe
Mini Plastic Connector Thre
Mini Plastic Connector Three
mini-bolt-down-aluminum-fitting-wire-and-conn
mini-male-3-pin-plastic-connector
mini-plastic-connector-three-pin
Miniature Steel Hex fitting with Wire and Conn
miniature-ceramic-female
miniature-ceramic-male
miniature-duplex-female
miniature-duplex-male
miniature-female
miniature-male
miniature-male-thermocouple-connectors-400-f-200-c-rated
miniature-panel-jack
miniature-panel-mount
miniature-pcb-flat-mounting
miniature-thermocouple-connectors
miniature-three-pin-female
miniature-three-pin-male
miniautre-steel-hex-fitting-with-wire-and-conn
MP-U
MPJ-U-F
mtp-u-f
mtp-u-m
multi-pin
multi-pin-connectors
Needle-Point
no-fitting
npt-fitting-and-wire
npt-fitting-with-wire-and-connector
num-8-32-w-250-hex
OSTW-U-F
OTP-U-F
P3A-TAPN-REC-PX-1-PFXX-40-STWL
P4A-BDFT-RECX-PK-125H-PFXX-16SWCP
P4A-NPT8-125-PX-2-PFXX-40-STWL
pcb-thermocouple-connectors
pfa-and-aluminum-mylar-inner-shield-on-k-wire
pfa-coated-rtd-probe
pfa-coated-thermocouple-probe
pfa-coated-thermocouple-probe-with-miniature-flat-pin-male-connector
pfa-coated-thermocouple-probes
pfa-plastic-fluoropolymer
Plastic Junction Box
Plastic Tube
plastic-fluoropolymer-ins-single-leads
plastic-fluorplymr-ins-wire-and-ss-armor
plastic-fluorplymr-ins-wire-with-ss-braid
polyimide-glass-reinforced-tape
PR-10-2-100-1/4-3-E
PR-10-2-100-1/4-4-E
PR-10-2-100-1/4-5-E
PR-10-2-100-1/4-6-E
PR-10-2-100-1/8-3-E
PR-10-2-100-1/8-4-E
PR-10-2-100-1/8-6-E
PR-10L-3-100-1/4-6
PR-10L-3-100-1/8-2
PR-10L-3-100-1/8-6-300
PR-10L-3-100-3/16-6
PR-10L-4-100-1/8-3
PR-10L-4-100-1/8-6
PR-11-2-100-1/4-3-E
PR-11-2-100-1/4-6-E-BX
PR-11-2-100-1/4-9-E
PR-11-2-100-1/8-6-E
PR-11-2-100-1/8-6-E-240
PR-11-2-100-3-16-6-E
PR-12E-3-100-1/4-18
PR-12L-3-100-1/4-18
PR-13-2-100-1/8-6-E
PR-13L-3-100-1/4-6
PR-20
PR-20-2-100-1/4-2-E-T
PR-20-2-100-1/8-2-E-T
PR-20-3-100-1/8-2-E-T
PR-21
PR-22
PR-22-3-100-A-1/4-0600-M12
PR-22-3-100-A-1/4-1200-M12
PR-22-3-100-B-1/4-0600-M12
PRCTL-2-100-A-1/4-24-40
PRCTL-3-100-A-1/4-24-40
probe
PRTF
PRTF-10-2-100-1/8-4-E
PRTF-10-2-100-1/8-6-E
Pt100 - 4 wire Class B
pt100-2-wire-class-b
pt100-3-wire-class-a
pt100-3-wire-class-b
pt100-4-wire-class-a
Round-Mounting-Flange
round-pin
rtd
RTD Probes
RTD Pt100 Air Temperature Sensors and Probes
RTD-1-F3105-36-T
RTD-2-F3105-36-T
RTD-2-F3105-36-T-OTP
rtd-3-f3105
RTD-3-F3105-36-T
RTD-805
rtd-830
RTD-830-4WIRE
rtd-830-mtp
rtd-831-mtp
RTD-850
RTD-880-100-OHMS
rtd-connector
rtd-connector-wire-cable
rtd-connectors
rtd-elements
rtd-miniature-flat-pin
RTD-NPT-72-E
RTD-NPT-72-E-1/4
rtd-probe-with-pfa-lead-wire
rtd-probes-with-900f-fiberglass-leads
rtd-probes-with-connectors
rtd-probes-with-fittings
RTD-Probes-with-Stainless-Steel-Braid-over-PFA-Leads
rtd-sensors
rtd-standard-round-pin
rtd-wire
rtd-wire-24s-awg-3-wire-design-098-diameter
rtd-wire-400-f-rated-fep-insulation
rtd-wire-400F-rated-FEP-insulation
rtd-wire-500f-rated-pfa-insulation
rtd-wire-with-stainless-steel-braid
RTDM12
RTDM12 RTD Sensor with M12 Connector
RTDM12-G1/8-3MM-24MM-A
SA1-RTD
Sa1-rtd-120
SA1-RTD-240
SA1-RTD-360
SA1-RTD-4W
SA1-RTD-4W-120
SA1-RTD-4W-80
SA1-RTD-4W-80-ROHS
SA1-RTD-80
SA1-RTD-MTP
self-adhesive-patch-and-wire
shielded-thermocouples
SHX-U-F
SHX-U-M
SMPW-U-F
SMPW-U-F-ROHS
SMPW-U-M
SMPW-U-M-ROHS
SMPW-U-MF
spade-lug-wire-lead
spring-loaded-rtd-probes-with fittings
spring-loaded-rtd-probes-with-fittings
ss-cage-housing-with-wire-and-connector
SSP-RTD-PT100
stainless-steel-316
stainless-steel-tube-with-wire-leads
standard-ceramic-female
standard-ceramic-male-hollow-pins
standard-ceramic-male-solid-pins
standard-duplex-female
standard-duplex-male
standard-female
standard-male
standard-male-3-pin-plastic-connector
standard-panel-jack
standard-thermocouple-connectors
standard-three-pin-female
standard-three-pin-male
std-plastic-connector-three-pin
stripped-ends
surface-probe
surface-rtd-with-non-sdhesive-surface-patch
tc-connectors
thermocouple-and-rtd-sensors-with-stripped-wire-ends
thermocouple-connector
thermocouple-extension-cables
thermocouple-extension-cables-and-connector-assemblies-with-stripped-ends
thermocouple-panel-jacks
THMU-SJ
threaded-ss-fitting
TRC#P1
TRC#P1A2X
TRC#P1B2X
TRM-P1B-3--0100X
TRMEXI#P1A-3--0100X
twisted-shielded-rtd-wire
Twisted-Shielded-Thermocouple-Wire
type-b-thermocouples
u
uncompensated-nickel-plated-copper-wire
UX-18527-84
wire-tc-and-rtd
Yageo-Nexensos-32208499
Yageo-Nexensos-32208503





