RTD Sensors and Probes - Pt100 Resistance Temperature Detectors - Items tagged as "50ft-long-leads"

RTD Sensors and Probes - Pt100 Resistance Temperature Detectors
RTD Sensors Probes and Resistance Temperature Detectors

 What is a RTD Sensor? It is a Temperature Sensor based on Resistance Temperature Detector (RTD) technology. The temperature measurement is a result of a measured Change in Resistance. As the temperature increases the resistance in the measurement circuit also increases.

  • The Temperature Sensing Element utilized in a RTD Sensor or RTD Probe Assemblies can have a temperature range from approximately -320 F Below Zero to 1,562 F (-196 to 850 C). Some speciality designs can reach 1,832 F (1,000 C)
  • RTD Probes with Pt100 Platinum (100 ohm) elements and 3 Wire Lead Design are one of most popular temperature sensors due to the ability to provide an excellent balance of accuracy, stability, ease of use and durability.
  • Presented Below is an extensive offering of 2, 3 and 4 wire RTD Probe Designs, related extension wires, connectors and other accessories for your temperature measurement application.
  • The Product Filter Search Tool on the Left provides the opportunity to quickly select the RTD product details best suited for your application.
  • Do you require Additional Technical Details on RTD Sensors and Probes? Click on this link RTD Probe Reference   
    View all .620" Wide x 1" Long Patch 0-08-inches-long 0-16-inches-long 0-5-inches-long 0-51-inches-long 0-94-inches-long 0.62-Inches-Long 0.79 Inches Long 1-2-npt-fitting 1-2-npt-fitting-spring-loaded 1-2-npt-ss-fitting 1-25-inch-l-x-250-circular 1-4-npt-fitting 1-4-npt-ss-fitting 1-5-inches-long 1-8-npt-fitting 1-8-npt-ss-fitting 1-inch-circular-flange-and-tube 1-inch-l-x-750-inch-wide 1-inch-long 1/2" Inch-Long 10-inches-long 100-inches 1000ft 100ft 108-inches 11-inches-long 118-inch-dia 12-inches 12-inches-long 120-inches 1200-Inches-100ft 125-inch-dia 144-Inches-12-Ft 176-inches 18-inches 18-inches-long 180-inches 188-inch-dia 192-inches 196-inches-16ft 197-inches-5-meters 2-inch-long-1-inch-wide 2-inches-long 2-Wire-RTD-Cable 2-wire-rtd-pt1000 2.5-inches-long 200ft 24-gage-stranded-thermocouple-and-rtd-wire 24-inches 24-inches-long 240 Inches Long 240-inches-20ft 250 250-inch-dia 25ft 26-gage-rtd-wire-pfa-insulated 26s-awg-2-wire-068-inch-dia 26s-awg-3-wire-072-inch-dia 26s-awg-3-wire-072-inch-dia 1 26s-awg-3-wire-contruction-072-inch-dia 26s-awg-4-wire-082-inch-dia 3-8-npt-ss-fitting 3-inches-long 3-wire-rtd-pt100 3-wire-rtd-pt1000 300-inches-25-ft 312-inch-l-x-250-wide 312-inch-long-500-inch-wide 316ss-tube 32208550 - Yageo-Nexensos 32208572 Yageo Nexensos 36-inches 360-inches-30-ft 396-Inches- 10-meters-(33-ft) 4 Pole Screw Terminal Connection Block 4-inches-long 4-mm diameter 4-wire-pt1000 4-wire-rtd-pt1000 4.5-Inches 40 Inches Long 40-inches 420-inches-35-ft 48-inches 480-inches-40-ft 5-inches-long 5-Meters 5/8-(0.625")-Inches-Long 500ft 50ft 50ft-long-leads 6-inches 6-inches-long 60-inches 600-inches-50-ft 7-inches-long 7-strands-of-34-awg-wire 7.5-inches-long 72 Inches Long 72-inches 8-inches 8-inches-long 80-inches 84-inches-7ft-long-wire-leads 9-Inches 9-inches-long 900-inches-75-ft 96-inches air-ss-fitting air-temperature-probe air-temperature-rtd-probe aluminum-flip-top-head aluminum-flip-top-head-and-spring bolt-down-rtd cast-iron-head compression-fitting-and-wire-leads connector-extension-cable-mini-male-female connector-extension-cable-mini-three-pin-male-female connectors-and-fittings CONV033 CONV353 cryogenic-rtd CSJT-UI cyrogenic-rtd element-and-wire exposed-element-with-stripped-wire-leads F3105 F3105-A F3145 fast-response-RTD-sensor field-cuttable-with-wire-leads flanged-probe flat-aluminum-fitting flat-pin G 1/8 Fitting Heraeus-32208499 Heraeus-32208503 Heraeus-32208550 Heraeus-32208572 Heraeus-Part-Number 32208548 Hermetically-Sealed-Flexible-RTD-Sensor-Probes hermetically-sealed-tip-with-stripped-wire-leads Hot-dog-and-Sausage-Probe iec-100-ohm industrial-probe LJ-U M12-and-other-circular-RTD-connectors m12-four-pin-female m12-four-pin-male m12-metal-circ-conn-npt-fitting-and-spring m12-metal-circular-conn-and-npt-fitting m12-metal-circular-connector m12-plastic-circular-conn-and-npt-fitting m12-plastic-circular-connector m12-plastic-conn-npt-fitting-and-transmit M12-R-M M12-S-M M12C metal-transition-with-lead-wire mi-cable-probe Mini Plastic Connector Thre Mini Plastic Connector Three mini-bolt-down-aluminum-fitting-wire-and-conn mini-male-3-pin-plastic-connector mini-plastic-connector-three-pin Miniature Steel Hex fitting with Wire and Conn miniature-ceramic-female miniature-ceramic-male miniature-duplex-female miniature-duplex-male miniature-female miniature-male miniature-male-thermocouple-connectors-400-f-200-c-rated miniature-panel-jack miniature-panel-mount miniature-pcb-flat-mounting miniature-thermocouple-connectors miniature-three-pin-female miniature-three-pin-male miniautre-steel-hex-fitting-with-wire-and-conn MP-U MPJ-U-F mtp-u-f mtp-u-m multi-pin multi-pin-connectors Needle-Point no-fitting npt-fitting-and-wire npt-fitting-with-wire-and-connector num-8-32-w-250-hex OSTW-U-F OTP-U-F P3A-TAPN-REC-PX-1-PFXX-40-STWL P4A-BDFT-RECX-PK-125H-PFXX-16SWCP P4A-NPT8-125-PX-2-PFXX-40-STWL pcb-thermocouple-connectors pfa-and-aluminum-mylar-inner-shield-on-k-wire pfa-coated-rtd-probe pfa-coated-thermocouple-probe pfa-coated-thermocouple-probe-with-miniature-flat-pin-male-connector pfa-coated-thermocouple-probes pfa-plastic-fluoropolymer Plastic Junction Box Plastic Tube plastic-fluoropolymer-ins-single-leads plastic-fluorplymr-ins-wire-and-ss-armor plastic-fluorplymr-ins-wire-with-ss-braid polyimide-glass-reinforced-tape PR-10-2-100-1/4-3-E PR-10-2-100-1/4-4-E PR-10-2-100-1/4-5-E PR-10-2-100-1/4-6-E PR-10-2-100-1/8-3-E PR-10-2-100-1/8-4-E PR-10-2-100-1/8-6-E PR-10L-3-100-1/4-6 PR-10L-3-100-1/8-2 PR-10L-3-100-1/8-6-300 PR-10L-3-100-3/16-6 PR-10L-4-100-1/8-3 PR-10L-4-100-1/8-6 PR-11-2-100-1/4-3-E PR-11-2-100-1/4-6-E-BX PR-11-2-100-1/4-9-E PR-11-2-100-1/8-6-E PR-11-2-100-1/8-6-E-240 PR-11-2-100-3-16-6-E PR-12E-3-100-1/4-18 PR-12L-3-100-1/4-18 PR-13-2-100-1/8-6-E PR-13L-3-100-1/4-6 PR-20 PR-20-2-100-1/4-2-E-T PR-20-2-100-1/8-2-E-T PR-20-3-100-1/8-2-E-T PR-21 PR-22 PR-22-3-100-A-1/4-0600-M12 PR-22-3-100-A-1/4-1200-M12 PR-22-3-100-B-1/4-0600-M12 PRCTL-2-100-A-1/4-24-40 PRCTL-3-100-A-1/4-24-40 probe PRTF PRTF-10-2-100-1/8-4-E PRTF-10-2-100-1/8-6-E Pt100 - 4 wire Class B pt100-2-wire-class-b pt100-3-wire-class-a pt100-3-wire-class-b pt100-4-wire-class-a Round-Mounting-Flange round-pin rtd RTD Probes RTD Pt100 Air Temperature Sensors and Probes RTD-1-F3105-36-T RTD-2-F3105-36-T RTD-2-F3105-36-T-OTP rtd-3-f3105 RTD-3-F3105-36-T RTD-805 rtd-830 RTD-830-4WIRE rtd-830-mtp rtd-831-mtp RTD-850 RTD-880-100-OHMS rtd-connector rtd-connector-wire-cable rtd-connectors rtd-elements rtd-miniature-flat-pin RTD-NPT-72-E RTD-NPT-72-E-1/4 rtd-probe-with-pfa-lead-wire rtd-probes-with-900f-fiberglass-leads rtd-probes-with-connectors rtd-probes-with-fittings RTD-Probes-with-Stainless-Steel-Braid-over-PFA-Leads rtd-sensors rtd-standard-round-pin rtd-wire rtd-wire-24s-awg-3-wire-design-098-diameter rtd-wire-400-f-rated-fep-insulation rtd-wire-400F-rated-FEP-insulation rtd-wire-500f-rated-pfa-insulation rtd-wire-with-stainless-steel-braid RTDM12 RTDM12 RTD Sensor with M12 Connector RTDM12-G1/8-3MM-24MM-A SA1-RTD Sa1-rtd-120 SA1-RTD-240 SA1-RTD-360 SA1-RTD-4W SA1-RTD-4W-120 SA1-RTD-4W-80 SA1-RTD-4W-80-ROHS SA1-RTD-80 SA1-RTD-MTP self-adhesive-patch-and-wire shielded-thermocouples SHX-U-F SHX-U-M SMPW-U-F SMPW-U-F-ROHS SMPW-U-M SMPW-U-M-ROHS SMPW-U-MF spade-lug-wire-lead spring-loaded-rtd-probes-with fittings spring-loaded-rtd-probes-with-fittings ss-cage-housing-with-wire-and-connector SSP-RTD-PT100 stainless-steel-316 stainless-steel-tube-with-wire-leads standard-ceramic-female standard-ceramic-male-hollow-pins standard-ceramic-male-solid-pins standard-duplex-female standard-duplex-male standard-female standard-male standard-male-3-pin-plastic-connector standard-panel-jack standard-thermocouple-connectors standard-three-pin-female standard-three-pin-male std-plastic-connector-three-pin stripped-ends surface-probe surface-rtd-with-non-sdhesive-surface-patch tc-connectors thermocouple-and-rtd-sensors-with-stripped-wire-ends thermocouple-connector thermocouple-extension-cables thermocouple-extension-cables-and-connector-assemblies-with-stripped-ends thermocouple-panel-jacks THMU-SJ threaded-ss-fitting TRC#P1 TRC#P1A2X TRC#P1B2X TRM-P1B-3--0100X TRMEXI#P1A-3--0100X twisted-shielded-rtd-wire Twisted-Shielded-Thermocouple-Wire type-b-thermocouples u uncompensated-nickel-plated-copper-wire UX-18527-84 wire-tc-and-rtd Yageo-Nexensos-32208499 Yageo-Nexensos-32208503

    Special Offers and Product Education