Temperature Probes, Sensors and Components - Items tagged as "50ft-long-leads"

Temperature Probes, Sensors and Components

A Temperature Probe or Temperature Sensors detects and measures the heat and or coolness of an object or environment (air, gas, liquid, flame, solid) and used to monitor or control temperature.

Some of the most utilized temperature probes are as follows.

  • Thermocouples - provide a very wide temperature range -454°F to 4,200°F (-270 to 2315°C), they can be larger rugged designs or micro sized to provide fast response and precision placement.
  • RTD (Resistance Temperature Device) -typically have a temperature range of -320F to 1,562 F  (-196 to 850 C). The utilization of RTD probes is significantly increasing due to thier high level of accuracy, stability and being interchangable. 
  • Infrared Temperature Measurement provides fast non contact temperture measurement and growing use of thermal imaging has increased the overall utilization
  • Thermistors are know for high accuracy in narrow temperture ranges and economically priced in high quantities
View all .620" Wide x 1" Long Patch 0-08-inches-long 0-16-inches-long 0-25-inches-long 0-5-inches-long 0-51-inches-long 0-94-inches-long 0.5-Meters-Long 0.62-Inches-Long 0.79 Inches Long 010-inch-dia 020-inch-dia 032-inch-dia 040-inch-dia 062-inch-dia 1-2-npt-fitting 1-2-npt-fitting-spring-loaded 1-2-npt-process-connect-1-2-npt-sensor-connect 1-2-npt-process-connect-3-0-mm-sensor-connect 1-2-npt-ss-fitting 1-25-inch-l-x-250-circular 1-4-npt-fitting 1-4-npt-ss-fitting 1-5-inches-long 1-8-npt-fitting 1-8-npt-ss-fitting 1-inch 1-inch-circular-flange-and-tube 1-inch-l-x-750-inch-wide 1-inch-long 1-inch-long-x-500-inch-wide 1/2" Inch-Long 1/2-260S-U41/2-304SS 10-inches-long 10-meters 100-inches 100-inches-long 1000ft 100ft 108-inches 108-inches-(9ft)long 10ft 11-inches-long 118-inch-dia 12-inches 12-inches-long 120-inches 120-inches-10ft-long 1200-Inches-100ft 125-inch-dia 14-inches 144-Inches-12-Ft 165-inches-long 176-inches 18-inches 18-inches-long 180-inches 188-inch-dia 192-inches 196-inches-16ft 197-inches-5-meters 2-5-inch-insertion 2-inch-long-1-inch-wide 2-inches 2-inches-long 2-Point-Temperature Calibration 2-Wire-RTD-Cable 2-wire-rtd-pt1000 2.5-inches-long 20 Inches Long 20-awg-pair 20-awg-pair-060-x-095-inch-dia 20-gage-beaded-thermocouples-500-f-260-c-pfa-insulation 20-gage-beaded-thermocouples-with-500-f-260-c-pfa-insulation 20-gage-solid-thermocouple-wire-900°F(480°C)-fiberglass-insulation 20-gage-thermocouple-wire-with-ceramic-fiber-insulation 20-gage-thermocouple-wire-with-fiberglass-insulation 20-gage-thermocouple-wire-with-pfa-insulation 20-inches 200-inches 200ft 200m 216-inches-18-ft 22-gage 22-gage-stranded-rtd-wire 22-gage-stranded-rtd-wire-fep-insulated 24 Gage Solid Thermocouple WIRE 900 F (482 C) Fiberglass Insulation 24-awg-pair-050-x-075-inch-dia 24-awg-pair-050-x-080-inch-dia 24-awg-pair-050-x-086-inch-dia 24-awg-pair-056-x-093-inch-dia 24-awg-pair-063-x-102-in-dia 24-awg-pair-090-x-125-inch-dia 24-awg-pair-110-max-inch-dia 24-gage-bare-wire-thermocouple-020-inch-diameter 24-gage-stranded-thermocouple-and-rtd-wire 24-inches 24-inches-long 240 Inches Long 240-inches-20ft 24s-awg-3-wire-097-inch-dia 250-inch-dia 250ft 25ft 26-gage-rtd-wire-pfa-insulated 26s-awg-2-wire-068-inch-dia 26s-awg-3-wire-072-inch-dia 26s-awg-3-wire-072-inch-dia 1 26s-awg-3-wire-contruction-072-inch-dia 26s-awg-4-wire-082-inch-dia 2ft 3-8-npt-ss-fitting 3-inches 3-inches-long 3-Point-Temperature-Calibration 3-wire-rtd-pt100 3-wire-rtd-pt1000 30-awg-pair-035-x-058-inch-dia 30-awg-pair-037-x-050-inch-dia 30-awg-pair-040-x-055-inch-dia 30-gage-010-diameter-thermocouple-wire-with-500f-260c-pfa-insulation 30-gage-bare-wire-sensor-010-inch-diameter 30-gage-thermocouple-wire-with-fiberglass-insulation 30-gage-thermocouple-wire-with-pfa-insulation 30-inches-long 300-inches-25-ft 304-ss-thermowell 312-inch-l-x-250-wide 312-inch-long-500-inch-wide 316ss-thermowell 316ss-tube 36-awg-pair-019-x-030-inch-dia 36-awg-pair-033-x-045-inch-dia 36-gage-005-pfa-insulated-thermocouple-beads 36-gage-bare-wire-thermocouple-005-inch-diameter 36-Gage-Fiberglass-Insulated-Thermocouple 36-gage-thermocouple-wire-with-pfa-insulation 36-inches 36-inches-long 360-inches-30-ft 396-Inches- 10-meters-(33-ft) 4 Pole Screw Terminal Connection Block 4-5-inch-insertion 4-inches 4-inches-long 4-mm diameter 4-wire-pt1000 4-wire-rtd-pt1000 4.5-Inches 40 Inches Long 40-awg-pair-017-x-026-inch-dia 40-gage-bare-wire-thermocouple-003-inch-diameter 40-inches 420-inches-35-ft 48-inches 48-inches-long 480-inches-40-ft 5-inches-long 5-Meters 5-Pack 5/8-(0.625")-Inches-Long 50-inch-long-wire-thermocouple 50-mm-insertion 500ft 50ft 50ft-long-leads 5srtc-gg-k-20-36 5srtc-gg-k-20-72 5SRTC-GG-K-24-120 5srtc-gg-k-24-36 5srtc-gg-k-24-72 5SRTC-GG-K-30 5SRTC-GG-K-30-120 5SRTC-GG-K-30-36 5SRTC-GG-K-30-50 5srtc-gg-k-30-72 5SRTC-GG-K-36 5SRTC-GG-K-36-120 5SRTC-GG-K-36-240 5SRTC-GG-K-36-50 5srtc-gg-t-30-120 5srtc-gg-t-30-36 5srtc-gg-t-30-72 5srtc-tt-j-30-72 5srtc-tt-k-20-36 5srtc-tt-k-20-72 5srtc-tt-k-24-36 5srtc-tt-k-24-72 5srtc-tt-k-30-36 5srtc-tt-k-30-72 5srtc-tt-k-36-36 5srtc-tt-k-36-72 5srtc-tt-k-40-36 5srtc-tt-k-40-72 5srtc-tt-t-20-36 5srtc-tt-t-20-72 5srtc-tt-t-24-36 5srtc-tt-t-24-72 5srtc-tt-t-30-36 5srtc-tt-t-30-72 5SRTC-TT-T-36-36 5SRTC-TT-T-36-72 5SRTC-TT-T-40-36 5SRTC-TT-T-40-72 5tc-gg-j-20-36 5tc-gg-j-20-72 5tc-gg-j-24-72 5tc-gg-j-30-40 5tc-gg-j-30-72 5tc-gg-k-20-36 5tc-gg-k-20-72 5tc-gg-k-24-36 5tc-gg-k-24-72 5tc-gg-k-30-36 5tc-gg-k-30-72 5tc-gg-k-36-36 5tc-gg-k-36-72 5TC-KK-K-30-36 5TC-PVC-K-24-180 5TC-PVC-T-24-180 5TC-TT-E-30-36 5tc-tt-j-20-36 5tc-tt-j-24-36 5tc-tt-j-24-72 5tc-tt-j-30-36 5tc-tt-j-30-72 5tc-tt-j-36-36 5tc-tt-j-36-72 5TC-TT-K-20-36 5tc-tt-k-20-72 5tc-tt-k-24-144 5tc-tt-k-24-36 5tc-tt-k-24-48 5tc-tt-k-24-72 5tc-tt-k-30-120 5tc-tt-k-30-36 5TC-TT-K-30-48 5tc-tt-k-30-72 5TC-TT-K-36-120 5TC-TT-K-36-36 5tc-tt-k-36-72 5tc-tt-k-40-36 5tc-tt-k-40-72 5TC-TT-T-20-180 5tc-tt-t-20-36 5tc-tt-t-20-72 5tc-tt-t-24-36 5tc-tt-t-24-72 5tc-tt-t-30-12 5tc-tt-t-30-36 5tc-tt-t-30-72 5TC-TT-T-36-12 5tc-tt-t-36-36 5tc-tt-t-36-72 5tc-tt-t-40-36 5tc-tt-t-40-72 6-inches 6-inches-long 60-inches 600-Inches 600-inches-50-ft 7-inches-long 7-strands-of-32-awg-wire 7-strands-of-34-awg-wire 7.5-inches-long 72-inches 8-inches 8-inches-long 80-inches 80-inches-long 804-7892 84-inches-7ft-long-wire-leads 9-Inches 9-inches-long 900-inches-75-ft 96-inches 96-inches-long-8ft ACCSMIAC ACCSUSBK air-ss-fitting air-temperature-probe air-temperature-rtd-probe aluminum-flip-top-head aluminum-flip-top-head-and-spring bare-wire-thermocouples beaded-wire-sensor beaded-wire-thermocouples-with-miniature-connectors bolt-down-rtd brass-1-4-npt-to-1-4-inch-probe brass-1-4-npt-to-1-8-inch-probe brass-1-8-npt-to-1-8-inch-probe brass-compression-fitting brass-thermowell c CAIN-116U-12-DUAL CAIN-14U-12-DUAL calibrated-thermocouples CASS-116G-12-PFA CASS-14U-6 CASS-18U-12-DUAL CASS-18U-12-NHX cast-iron-head ceramic-fiber-ins-wire-with-inconel-braid ceramic-insulated-thermocouples ceramic-or-silica-fiber-insulated-thermocouple-wire CMJ-KAPF co1 k CO1-K-72 INCH CO3-K CO3-K-72 Compact Fixed Mount Infrared Thermometer compression-fitting-and-wire-leads connector-extension-cable-mini-male-female connector-extension-cable-mini-three-pin-male-female connectors-and-fittings CONV033 CONV353 CPSS-18G-12-PFA cryogenic-rtd CSJT-UI custom lengths cyrogenic-rtd DTC-K-F DTC-K-M dual-thermocouple-probe-with-standard-size-connectors e element-and-wire emissions engine-technology EQSS-18U-6 exposed exposed-element-with-stripped-wire-leads exposed-epoxy EXPP-J-24S Extension-Grade-Thermocouple- Wire fast-response-RTD-sensor FEP-Insulated-Extension-Grade-Thermocouple-Wire FF-J-24-1000 FF-J-24S-TWSH-1000 FF-K-24-TWSH-1000 FF-K-24S-TWSH-1000 fiberglass-ins-wire fiberglass-insulated-thermocouple-wire-24-gage-solid-900-f-rating fiberglass-on-k-wire Fiberglass-on-RS-Wire field-cuttable-with-wire-leads flanged-probe flat-aluminum-fitting flat-pin flat-weld-bead G 1/8 Fitting GG-K-20-1000 grounded Handheld Thermometer handheld-thermocouple-probes Hermetically-Sealed-Flexible-RTD-Sensor-Probes hermetically-sealed-tip-with-stripped-wire-leads high-temperature-thermocouple highest-temperature-thermocouple hmp-k-f Hot-dog-and-Sausage-Probe ICSS-116G-12-PFA ICSS-116G-18-PFA ICSS-18G-12-PFA ICSS-18G-18-PFA iec-100-ohm iec-color-code inconel-600 industrial-probe infrared Infrared Temperature Infrared Temperature Sensor and Transmitter - Compact Fixed Mount Design Infrared Temperature Sensors Infrared Thermometers Pyrometers infrared-camera infrared-temperature-sensor-accessories j j-calibration-tc-wire j-fast-response JMQSS-062G-3 JMQSS-062G-6 JMQSS-062U-6 JMQSS-125G-3 JMQSS-125G-4 JMQSS-125U-6 JP-E-F JP-K-F JQIN-18U-12 JQSS-18G-12 JQSS-18G-18 JQSS-18G-3 JQSS-18U-6 JQSS-316U-12 k k-calibration-tc-wire k-dual k-fast-response kapton-ins-wire KMQIN-040U-24 KMQIN-062E-12 KMQIN-062G-3 KMQIN-062G-6 KMQIN-062U-12 KMQIN-062U-24 KMQIN-062U-3 kmqin-125U-165 KMQSS-020G-12 KMQSS-020G-6 KMQSS-040G-6 KMQSS-040U-12 KMQSS-040U-6 KMQSS-062E-12 kmqss-062g-12 kmqss-062u-18 KMQSS-062U-24 kmqss-062u-6 KMQSS-116E-18 KMQSS-125E-6 KMQSS-125G-6 KMQSS-125U-12 KMQSS-125U-18 KMQSS-125U-3 kmqss-125u-4 kmqss-125u-6 KQIN-18U-18 KQIN-18U-6 KQSS-116U-18 KQSS-14U-6 KQSS-18U-12 KQSS-18U-18 KQSS-18U-36 KQSS-18U-6 KQSS-316U-12 LJ-C LJ-E LJ-J LJ-K LJ-N LJ-R/S LJ-RS LJ-T LJ-U LP-K M12-and-other-circular-RTD-connectors m12-four-pin-female m12-four-pin-male m12-metal-circ-conn-npt-fitting-and-spring m12-metal-circular-conn-and-npt-fitting m12-metal-circular-connector m12-plastic-circular-conn-and-npt-fitting m12-plastic-circular-connector m12-plastic-conn-npt-fitting-and-transmit M12-R-M M12-S-M M12C metal-transition-to-lead-wire metal-transition-with-lead-wire mi-cable-probe mine-tailings Mini Brass Crimp Adapter 3.0MM Probe Mini Brass Crimp Adapter .125 Probe Mini Plastic C Mini Plastic Co Mini Plastic Conn Mini Plastic Conne Mini Plastic Connector Thre Mini Plastic Connector Three mini-2-pin-connector-rubber-boot mini-3-pin-connector-rubber-boot mini-bolt-down-aluminum-fitting-wire-and-conn mini-brass-crimp-adapter-020-probe mini-brass-crimp-adapter-032-probe mini-brass-crimp-adapter-040-probe mini-brass-crimp-adapter-063-probe mini-brass-crimp-adpater-1-5mm-probe mini-ceramic-connector mini-ceramic-connector-wire-clamp mini-connector-locking-clip-plate mini-connector-strain-relief mini-connector-wire-clamp mini-dual-connector-wire-clamp mini-grommet-for-20-awg-and-larger mini-grommet-for-24-awg mini-grommet-for-30-awg-and-smaller mini-high-temperature-rubber-boot mini-male-3-pin-plastic-connector mini-male-ceramic-connector mini-male-dual-connector mini-male-hi-temp-plastic-connector mini-male-plastic-connector mini-plastic-connector mini-plastic-connector-three-pin mini-ss-crimp-adapter-040-probe mini-ss-crimp-adapter-063-probe mini-ss-crimp-adapter-125-probe mini-ss-crimp-adapter-3-0mm-probe mini-ultra-high-temperature-connector-wire-clamp mini-wire-insert-for-20-awg mini-wire-insert-for-24-awg mini-wire-insert-for-30-awg Miniature Infrared Temperature Sensors Miniature Steel Hex fitting with Wire and Conn miniature-braze-crimp-adapter miniature-ceramic-female miniature-ceramic-male miniature-crimp-adapter miniature-duplex-female miniature-duplex-male miniature-female miniature-female-thermocouple-connectors-400-f-200-c-rated miniature-grommet miniature-high-temperature-female miniature-high-temperature-male miniature-locking-clip miniature-locking-female miniature-locking-male miniature-male miniature-male-plastic-connector miniature-male-thermocouple-connectors-400-f-200-c-rated miniature-panel-jack miniature-panel-mount miniature-pcb-flat-mounting miniature-pcb-rear-mounting miniature-pcb-side-mounting miniature-protection-boot miniature-strain-relief miniature-thermocouple-connector-accessories miniature-thermocouple-connectors miniature-three-pin-female miniature-three-pin-male miniature-ultra-high-temperature-female miniature-ultra-high-temperature-male miniature-wire-clamp-bracket miniature-wire-insert miniautre-steel-hex-fitting-with-wire-and-conn mining mounting-fittings MP-U MPJ-C-F MPJ-J-F mpj-k-f MPJ-T-F MPJ-U-F MRBS MTC-12-FF mtp-u-f mtp-u-m multi-pin multi-pin-connectors n Needle-Point NHX-C-F NHX-N-M NHXH-C-M no-fitting npt-fitting-and-wire npt-fitting-with-wire-and-connector num-8-32-w-250-hex OM-CP-OCTPRO OST-J-M-ROHS OSTW-C-F OSTW-C-M OSTW-E-F OSTW-J-F OSTW-J-F-ROHS OSTW-J-M OSTW-J-M-ROHS OSTW-K-F OSTW-K-M OSTW-N-F OSTW-R/S-F OSTW-RS-F OSTW-T-F OSTW-U-F OTP-K-M OTP-K-M-ROHS OTP-U-F P13R-005 P4A-BDFT-RECX-PK-125H-PFXX-16SWCP pcb-thermocouple-connectors PCC-SMP-K-100 PCC-SMP-K-5 PCLM pfa-and-aluminum-mylar-inner-shield-on-j-wire pfa-and-aluminum-mylar-inner-shield-on-k-wire pfa-coated-rtd-probe pfa-coated-thermocouple-probe pfa-coated-thermocouple-probe-with-miniature-flat-pin-male-connector pfa-coated-thermocouple-probes pfa-plastic-fluoropolymer pfa-plastic-fluoropolymer-on-j-wire pfa-plastic-fluoropolymer-on-k-wire pfa-plastic-fluoropolymer-on-t-wire Plastic Junction Box Plastic Tube plastic-fluoropolymer-ins-single-leads plastic-fluoropolymer-ins-wire plastic-fluoropolymer-ins-wire-ss-braid plastic-fluoropolymer-insulated-wire plastic-fluorplymr-ins-wire-and-ss-armor plastic-fluorplymr-ins-wire-with-ss-braid polyimide-glass-reinforced-tape PR-10-2-100-1/4-3-E PR-10-2-100-1/4-4-E PR-10-2-100-1/4-5-E PR-10-2-100-1/4-6-E PR-10-2-100-1/8-3-E PR-10-2-100-1/8-4-E PR-10-2-100-1/8-6-E PR-10L-3-100-1/4-6 PR-10L-3-100-1/8-2 PR-10L-3-100-1/8-6-300 PR-10L-3-100-3/16-6 PR-10L-4-100-1/8-3 PR-10L-4-100-1/8-6 PR-11-2-100-1/4-3-E PR-11-2-100-1/4-6-E-BX PR-11-2-100-1/4-9-E PR-11-2-100-1/8-6-E PR-11-2-100-1/8-6-E-240 PR-11-2-100-3-16-6-E PR-12E-3-100-1/4-18 PR-12L-3-100-1/4-18 PR-13-2-100-1/8-6-E PR-13L-3-100-1/4-6 PR-20 PR-20-2-100-1/4-2-E-T PR-20-2-100-1/8-2-E-T PR-20-3-100-1/8-2-E-T PR-21 PR-22 PR-22-3-100-A-1/4-0600-M12 PR-22-3-100-A-1/4-1200-M12 PRCTL-2-100-A-1/4-24-40 PRCTL-3-100-A-1/4-24-40 probe probe-fitting PRTF PRTF-10-2-100-1/8-4-E PRTF-10-2-100-1/8-6-E Pt100 - 4 wire Class B pt100-2-wire-class-b pt100-3-wire-class-a pt100-3-wire-class-b pt100-4-wire-class-a pvc-ins-wire Round-Mounting-Flange round-pin rs RSCCSTCLT15 rtd RTD Probes RTD Pt100 Air Temperature Sensors and Probes RTD-1-F3105-36-T RTD-2-F3105-36-T RTD-2-F3105-36-T-OTP rtd-3-f3105 RTD-3-F3105-36-T RTD-805 rtd-830 RTD-830-4WIRE rtd-830-mtp rtd-831-mtp RTD-850 rtd-connector rtd-connector-wire-cable rtd-connectors RTD-Extension-Wire 26S -AWG-3-Wire-Design- .072"-Diameter rtd-instruments rtd-miniature-flat-pin RTD-NPT-72-E RTD-NPT-72-E-1/4 rtd-probe-with-pfa-lead-wire rtd-probes-with-900f-fiberglass-leads rtd-probes-with-connectors rtd-probes-with-fittings RTD-Probes-with-Stainless-Steel-Braid-over-PFA-Leads rtd-sensors rtd-standard-round-pin rtd-wire rtd-wire-24s-awg-3-wire-design-098-diameter rtd-wire-400-f-rated-fep-insulation rtd-wire-400F-rated-FEP-insulation rtd-wire-500f-rated-pfa-insulation RTDM12 RTDM12 RTD Sensor with M12 Connector RTDM12-G1/8-3MM-24MM-A SA1-J SA1-J-120-SC SA1-J-120-SRTC SA1-J-72 SA1-J-SRTC SA1-K SA1-K-120-SRTC SA1-K-180 SA1-K-72 SA1-K-72-SRTC SA1-K-SRTC SA1-K-SRTC-120 SA1-RTD Sa1-rtd-120 SA1-RTD-240 SA1-RTD-360 SA1-RTD-4W SA1-RTD-4W-120 SA1-RTD-4W-80 SA1-RTD-4W-80-ROHS SA1-RTD-80 SA1-RTD-MTP SA1-Self Adhesive Patch 1 Inch SA1-T sa1-t-72 SA1-T-72-SRTC SA1-T-SRTC SA1XL - Self Adhesive 1 inch Patch Xtra Line SA1XL-J SA1XL-J-72 sa1xl-k SA1XL-K-120 SA1XL-K-120-SRTC SA1XL-K-72 SA1XL-K-72-SRTC SA1XL-K-SRTC SA1XL-T SA1XL-T-120 SA1XL-T-120-SRTC SA1XL-T-72-SRTC SAS-TRJE-4-36 SB-SMP-CR062 SCAIN-020G-6 SCAIN-032U-12 SCAIN-062U-12 SCAIN-062U-18 SCASS-020G-12 SCASS-020G-6 SCASS-020U-12 SCASS-032U-6 SCASS-062U-12-SHX SCASS-062U-6-DUAL SCASS-125U-6-DUAL self-adhesive-patch-and-wire self-adhesive-patch-with-wire-and-connector self-adhesive-patch-with-wire-leads shielded-thermocouples shx-c-f SHX-C-M SHX-E-F SHX-E-M SHX-J-F SHX-J-M SHX-K-F SHX-K-M SHX-N-F SHX-N-M SHX-RS-F SHX-RS-M SHX-T-F SHX-T-M SHX-U-F SHX-U-M SMPW-C-F SMPW-C-M SMPW-CC-K-M SMPW-J-F SMPW-J-M SMPW-K-F SMPW-K-F-ROHS SMPW-K-M SMPW-K-M-ROHS SMPW-K-MF SMPW-KI-F SMPW-N-F SMPW-N-M SMPW-R/S-F SMPW-R/S-M SMPW-T-M SMPW-T-M-ROHS SMPW-U-F SMPW-U-F-ROHS SMPW-U-M SMPW-U-M-ROHS SMPW-U-MF SMTS-TC-036-U-K-N solid-wire solid-wire-twisted spade-lug-wire-lead SPJ-E-F SPJ-J-F SPJ-K-F spring-loaded-rtd-probes-with fittings spring-loaded-rtd-probes-with-fittings ss-cage-housing-with-wire-and-connector SSLK-18-18 SSP-RTD-PT100 stainless steel-1-4-npt-to 3-16-inch stainless steel-1-8-npt-to 3-16-inch stainless-steel-1-4-npt-to-1-4-inch-probe stainless-steel-1-4-npt-to-1-8-inch-probe stainless-steel-1-8-npt-to-1-8-inch-probe stainless-steel-304 stainless-steel-316 stainless-steel-compression-fitting stainless-steel-compression-fitting-1-2-npt-to-1-4-inch-probe stainless-steel-compression-fitting-1-2-npt-to-3-mm-probe stainless-steel-compression-fitting-1-4-bspt-to-1-4-probe stainless-steel-compression-fitting-1-4-npt-for-3-16-inch-probe stainless-steel-compression-fitting-1-4-npt-to-3-mm-probe stainless-steel-compression-fitting-1-8-npt-to-1-16-probe stainless-steel-compression-fitting-stainless-steel-1-8-npt-to-3-16-inch-probe stainless-steel-tube-with-wire-leads standard standard-2-pin-connector-rubber-boot standard-3-pin-connector-rubber-boot standard-brass-crimp-adapter-063-probe standard-brass-crimp-adapter-125-probe standard-brass-crimp-adapter-187-probe standard-brass-crimp-adapter-250-probe standard-brass-crimp-adpater-3-0-mm-probe standard-braze-crimp-adapter standard-ceramic-connector-tube-adapter-for-125-probe standard-ceramic-connector-tube-adapter-for-250-probe standard-ceramic-connector-wire-clamp standard-ceramic-female standard-ceramic-male-hollow-pins standard-ceramic-male-solid-pins standard-connector-strain-relief standard-connector-tube-adapter-for-063-probe standard-connector-tube-adapter-for-125-probe standard-connector-tube-adapter-for-187-probe standard-connector-tube-adapter-for-250-probe standard-connector-wire-clamp standard-crimp-insert standard-dual-connector-wire-clamp standard-duplex-female standard-duplex-male standard-female standard-grommet standard-grommet-for-18-awg-and-larger standard-grommet-for-20-awg standard-grommet-for-24-awg standard-high-temperature-female standard-high-temperature-male standard-locking-clip standard-male standard-male-3-pin-plastic-connector standard-male-ceramic-connector standard-male-dual-connector standard-male-hi-temp-plastic-connector standard-male-plastic-connector standard-panel-insert-flanged standard-panel-jack standard-plastic-connector standard-protection-boot standard-size-male-ceramic standard-ss-crimp-adapter-063-probe standard-ss-crimp-adapter-125-probe standard-ss-crimp-adapter-187-probe standard-ss-crimp-adapter-250-probe standard-ss-crimp-adpater-3-0-mm-probe standard-strain-relief standard-thermocouple-connector-accessories standard-thermocouple-connectors standard-three-pin-female standard-three-pin-male standard-tube-adapter standard-ultra-high-temperature-connector-wire-clamp standard-ultra-high-temperature-female standard-ultra-high-temperature-male standard-wire-clamp-bracket standard-wire-insert standard-wire-insert-for-20-awg standard-wire-insert-for-24-awg std-plastic-connector-three-pin std-plug-1200-f-650-c-max-rating-with-solid-pins stripped-ends stripped-wire-leads surface-probe surface-rtd-with-non-sdhesive-surface-patch surface-thermocouple-probes surface-thermocouple-with-non-adhesive-patch surface-thermocouples-bolt-on-design t t-calibration-tc-wire t-fast-response T5R-003-12 T5R-005-12 T5R-010-12 T5R-020-12 T5R-020-18 T5R-020-24 tailings TAS-E-2 TAS-E-3 TAS-J-2 TAS-J-3 TAS-K-1 TAS-K-2 TAS-K-3 TAS-K-4 TAS-T-2 TAS-T-3 tc-connectors tc-mi-cable-probe tc-surface-probe Thermal Imager thermocouple thermocouple extension cable with female connector and stripped leads thermocouple-adapters thermocouple-and-rtd-sensors-with-stripped-wire-ends thermocouple-connector thermocouple-connectors Thermocouple-Connectors- 4-Prong Thermocouple-Connectors- 4-Prong-Dual-Circuit thermocouple-extension-cable-with-miniature-male-connector thermocouple-extension-cables thermocouple-extension-cables-and-connector-assemblies-with-stripped-ends thermocouple-extension-wire thermocouple-meters thermocouple-panel-jacks thermocouple-probes thermocouple-probes-with-900°F-fiberglass-rated-leads thermocouple-probes-with-lead-wire-and-miniature-plastic-connector thermocouple-probes-with-miniature-connectors thermocouple-probes-with-transition-to-fiberglass-lead-wire thermocouple-probes-with-transition-to-lead-wire-with-stripped-ends thermocouple-wire-with-stainless-steel-braid Thermocouples-with-20-Gage-Fiberglass-Insulated-Leads thermowell THMC-SJ THME-SJ THMJ-SJ THMK-SJ THMK-SP THMN-SJ THMT-SJ THMU-SJ threaded-probe threaded-ss-fitting threaded-thermocouple TJ300-CASS-18U-12 TJ36-CAIN-18U-6-CC-XCIB TJ36-CASS-116G-6-SB-SMPW-M TJ36-CASS-116U-12 TJ36-CASS-116U-12-SMPW-M TJ36-CASS-116U-6-SB-SMPW-M TJ36-CASS-116U-6-SMPW-M TJ36-CASS-14U-6-SB-SMPW-M TJ36-CASS-18G-12-SB-SMPW-M TJ36-CASS-18U-12 TJ36-CASS-18U-6 TJ36-CASS-18U-6-SB-SMPW-M TJ36-CPSS-116U-6 TJ36-CPSS-116U-6-SMPW-M TJ36-CPSS-18U-3 TJ36-ICSS-14U-12 TJ36-ICSS-14U-6 TJ36-ICSS-14U-6-SMPW-M TJ36-ICSS-18U-6-SB TJ36-ICSS-316E-4 TJ72-CPSS-116U-6 TMQSS-062G-6 TMQSS-062U-3 TMQSS-062U-6 TMQSS-125G-6 TMQSS-125U-6 TMQSS-18U-3 TQSS-18U-12 TQSS-18U-4 TQSS-18U-6 TRC#P1 TRC#P1A2X TRC#P1B2X TRM-P1B-3--0100X TT-J-24-1000 TT-J-30-1000 TT-K-40-1000 TT-T-30-1000 Twisted-Shielded-Thermocouple-Wire Type C Thermocouple Connector Type C Thermocouple Extension Wire type-b-thermocouples type-c-thermocouple-wire type-e-thermocouples type-j-dual-thermocouple type-j-thermocouple-extension-wire type-j-thermocouple-wire type-k-thermocouple-probes-with-miniature-connectors type-n-thermocouple-wire type-rs-thermocouple-extension-wire u u-thermocouple uncompensated-nickel-plated-copper-wire ungrounded ushx-c-f ushx-c-m UX-18527-84 wire-bead-weld wire-tc-and-rtd wire-tc-and-rtd-products WTJ-HD-72-S

Special Offers and Product Education