Pt100 RTD - Items tagged as "50ft-long-leads"

Pt100 RTD

Pt100 is a platinum based RTD (resistance temperature detector) with 100 ohm output at 0°C and a 0.385 change per degree C. 

  • Pt100 Temperature Sensors typically have Higher Accuracy and Stability than thermocouples or infrared temperature sensors.
    • Temperature range of -328 (-200°C) Cryogenic through 1,562°F (850°C).
    • RTD sensors can have a slower temperature response time.
  • RTD Pt100 elements are commonly encased in a metal tube or fitting to protect the sensing element itself. The elements are primarliy made in 2 designs.
    • A Thin film ceramic chip is the most utlized design, where the platinum is deposited onto the alumina (ceramic) substrate and 100 ohm resistance pattern is created through photolithography, etching and laser trimming.
    • Wire-wound elements has a fine diameter platinum wire is wrapped and fused inside a glass casing or embedded in ceramic.
    • Exposed Pt100 (RTD) sensor assemblies can provide a 5 times Faster Temperature Response as compared to designs encased in a probe.
  • Lead Wire construction can be 2, 3 or 4 wire designs.
    • The 3 wire is the most common design, the 4 wire configuration can provide additional accuracy.
    • 2 wire designs can have lower accuracy with lead wire adding resistance and more commonly used with Pt1000 ohm element. 
  • Pt100's are also relatively immune to electrical noise and can be used in industrial environments, around motors, generators and other high voltage equipment.
    • Additional electrical immunity can be achieved with shielding and ground wire designs.
  • The Filter Search Tool on the  Left of the page provides the opportunity to quickly select the RTD product details best suited for your application.
View all .620" Wide x 1" Long Patch 0-08-inches-long 0-16-inches-long 0-5-inches-long 0-51-inches-long 0-94-inches-long 0.62-Inches-Long 0.79 Inches Long 1-2-npt-fitting 1-2-npt-fitting-spring-loaded 1-2-npt-ss-fitting 1-25-inch-l-x-250-circular 1-4-npt-fitting 1-4-npt-ss-fitting 1-5-inches-long 1-8-npt-fitting 1-8-npt-ss-fitting 1-inch-circular-flange-and-tube 1-inch-l-x-750-inch-wide 1-inch-long 1/2" Inch-Long 10-inches-long 100-inches 1000ft 100ft 108-inches 11-inches-long 118-inch-dia 12-inches 12-inches-long 120-inches 1200-Inches-100ft 125-inch-dia 144-Inches-12-Ft 176-inches 18-inches 18-inches-long 180-inches 188-inch-dia 192-inches 196-inches-16ft 197-inches-5-meters 2-inch-long-1-inch-wide 2-inches-long 2-Wire-RTD-Cable 2-wire-rtd-pt1000 2.5-inches-long 200ft 24-gage-stranded-thermocouple-and-rtd-wire 24-inches 24-inches-long 240 Inches Long 240-inches-20ft 250 250-inch-dia 25ft 26-gage-rtd-wire-pfa-insulated 26s-awg-2-wire-068-inch-dia 26s-awg-3-wire-072-inch-dia 26s-awg-3-wire-072-inch-dia 1 26s-awg-3-wire-contruction-072-inch-dia 26s-awg-4-wire-082-inch-dia 3-8-npt-ss-fitting 3-inches-long 3-wire-rtd-pt100 3-wire-rtd-pt1000 300-inches-25-ft 312-inch-l-x-250-wide 312-inch-long-500-inch-wide 316ss-tube 32208550 - Yageo-Nexensos 32208572 Yageo Nexensos 36-inches 360-inches-30-ft 396-Inches- 10-meters-(33-ft) 4 Pole Screw Terminal Connection Block 4-inches-long 4-mm diameter 4-wire-pt1000 4-wire-rtd-pt1000 4.5-Inches 40 Inches Long 40-inches 420-inches-35-ft 48-inches 480-inches-40-ft 5-inches-long 5-Meters 5/8-(0.625")-Inches-Long 500ft 50ft 50ft-long-leads 6-inches 6-inches-long 60-inches 600-inches-50-ft 7-inches-long 7-strands-of-34-awg-wire 7.5-inches-long 72 Inches Long 72-inches 8-inches 8-inches-long 80-inches 84-inches-7ft-long-wire-leads 9-Inches 9-inches-long 900-inches-75-ft 96-inches air-ss-fitting air-temperature-probe air-temperature-rtd-probe aluminum-flip-top-head aluminum-flip-top-head-and-spring bolt-down-rtd cast-iron-head compression-fitting-and-wire-leads connector-extension-cable-mini-male-female connector-extension-cable-mini-three-pin-male-female connectors-and-fittings CONV033 CONV353 cryogenic-rtd CSJT-UI cyrogenic-rtd element-and-wire exposed-element-with-stripped-wire-leads F3105 F3105-A F3145 fast-response-RTD-sensor field-cuttable-with-wire-leads flanged-probe flat-aluminum-fitting flat-pin G 1/8 Fitting Heraeus-32208499 Heraeus-32208503 Heraeus-32208550 Heraeus-32208572 Heraeus-Part-Number 32208548 Hermetically-Sealed-Flexible-RTD-Sensor-Probes hermetically-sealed-tip-with-stripped-wire-leads Hot-dog-and-Sausage-Probe iec-100-ohm industrial-probe LJ-U M12-and-other-circular-RTD-connectors m12-four-pin-female m12-four-pin-male m12-metal-circ-conn-npt-fitting-and-spring m12-metal-circular-conn-and-npt-fitting m12-metal-circular-connector m12-plastic-circular-conn-and-npt-fitting m12-plastic-circular-connector m12-plastic-conn-npt-fitting-and-transmit M12-R-M M12-S-M M12C metal-transition-with-lead-wire mi-cable-probe Mini Plastic Connector Thre Mini Plastic Connector Three mini-bolt-down-aluminum-fitting-wire-and-conn mini-male-3-pin-plastic-connector mini-plastic-connector-three-pin Miniature Steel Hex fitting with Wire and Conn miniature-ceramic-female miniature-ceramic-male miniature-duplex-female miniature-duplex-male miniature-female miniature-male miniature-male-thermocouple-connectors-400-f-200-c-rated miniature-panel-jack miniature-panel-mount miniature-pcb-flat-mounting miniature-thermocouple-connectors miniature-three-pin-female miniature-three-pin-male miniautre-steel-hex-fitting-with-wire-and-conn MP-U MPJ-U-F mtp-u-f mtp-u-m multi-pin multi-pin-connectors Needle-Point no-fitting npt-fitting-and-wire npt-fitting-with-wire-and-connector num-8-32-w-250-hex OSTW-U-F OTP-U-F P3A-TAPN-REC-PX-1-PFXX-40-STWL P4A-BDFT-RECX-PK-125H-PFXX-16SWCP P4A-NPT8-125-PX-2-PFXX-40-STWL pcb-thermocouple-connectors pfa-and-aluminum-mylar-inner-shield-on-k-wire pfa-coated-rtd-probe pfa-coated-thermocouple-probe pfa-coated-thermocouple-probe-with-miniature-flat-pin-male-connector pfa-coated-thermocouple-probes pfa-plastic-fluoropolymer Plastic Junction Box Plastic Tube plastic-fluoropolymer-ins-single-leads plastic-fluorplymr-ins-wire-and-ss-armor plastic-fluorplymr-ins-wire-with-ss-braid polyimide-glass-reinforced-tape PR-10-2-100-1/4-3-E PR-10-2-100-1/4-4-E PR-10-2-100-1/4-5-E PR-10-2-100-1/4-6-E PR-10-2-100-1/8-3-E PR-10-2-100-1/8-4-E PR-10-2-100-1/8-6-E PR-10L-3-100-1/4-6 PR-10L-3-100-1/8-2 PR-10L-3-100-1/8-6-300 PR-10L-3-100-3/16-6 PR-10L-4-100-1/8-3 PR-10L-4-100-1/8-6 PR-11-2-100-1/4-3-E PR-11-2-100-1/4-6-E-BX PR-11-2-100-1/4-9-E PR-11-2-100-1/8-6-E PR-11-2-100-1/8-6-E-240 PR-11-2-100-3-16-6-E PR-12E-3-100-1/4-18 PR-12L-3-100-1/4-18 PR-13-2-100-1/8-6-E PR-13L-3-100-1/4-6 PR-20 PR-20-2-100-1/4-2-E-T PR-20-2-100-1/8-2-E-T PR-20-3-100-1/8-2-E-T PR-21 PR-22 PR-22-3-100-A-1/4-0600-M12 PR-22-3-100-A-1/4-1200-M12 PR-22-3-100-B-1/4-0600-M12 PRCTL-2-100-A-1/4-24-40 PRCTL-3-100-A-1/4-24-40 probe PRTF PRTF-10-2-100-1/8-4-E PRTF-10-2-100-1/8-6-E Pt100 - 4 wire Class B pt100-2-wire-class-b pt100-3-wire-class-a pt100-3-wire-class-b pt100-4-wire-class-a Round-Mounting-Flange round-pin rtd RTD Probes RTD Pt100 Air Temperature Sensors and Probes RTD-1-F3105-36-T RTD-2-F3105-36-T RTD-2-F3105-36-T-OTP rtd-3-f3105 RTD-3-F3105-36-T RTD-805 rtd-830 RTD-830-4WIRE rtd-830-mtp rtd-831-mtp RTD-850 RTD-880-100-OHMS rtd-connector rtd-connector-wire-cable rtd-connectors rtd-elements rtd-miniature-flat-pin RTD-NPT-72-E RTD-NPT-72-E-1/4 rtd-probe-with-pfa-lead-wire rtd-probes-with-900f-fiberglass-leads rtd-probes-with-connectors rtd-probes-with-fittings RTD-Probes-with-Stainless-Steel-Braid-over-PFA-Leads rtd-sensors rtd-standard-round-pin rtd-wire rtd-wire-24s-awg-3-wire-design-098-diameter rtd-wire-400-f-rated-fep-insulation rtd-wire-400F-rated-FEP-insulation rtd-wire-500f-rated-pfa-insulation rtd-wire-with-stainless-steel-braid RTDM12 RTDM12 RTD Sensor with M12 Connector RTDM12-G1/8-3MM-24MM-A SA1-RTD Sa1-rtd-120 SA1-RTD-240 SA1-RTD-360 SA1-RTD-4W SA1-RTD-4W-120 SA1-RTD-4W-80 SA1-RTD-4W-80-ROHS SA1-RTD-80 SA1-RTD-MTP self-adhesive-patch-and-wire shielded-thermocouples SHX-U-F SHX-U-M SMPW-U-F SMPW-U-F-ROHS SMPW-U-M SMPW-U-M-ROHS SMPW-U-MF spade-lug-wire-lead spring-loaded-rtd-probes-with fittings spring-loaded-rtd-probes-with-fittings ss-cage-housing-with-wire-and-connector SSP-RTD-PT100 stainless-steel-316 stainless-steel-tube-with-wire-leads standard-ceramic-female standard-ceramic-male-hollow-pins standard-ceramic-male-solid-pins standard-duplex-female standard-duplex-male standard-female standard-male standard-male-3-pin-plastic-connector standard-panel-jack standard-thermocouple-connectors standard-three-pin-female standard-three-pin-male std-plastic-connector-three-pin stripped-ends surface-probe surface-rtd-with-non-sdhesive-surface-patch tc-connectors thermocouple-and-rtd-sensors-with-stripped-wire-ends thermocouple-connector thermocouple-extension-cables thermocouple-extension-cables-and-connector-assemblies-with-stripped-ends thermocouple-panel-jacks THMU-SJ threaded-ss-fitting TRC#P1 TRC#P1A2X TRC#P1B2X TRM-P1B-3--0100X TRMEXI#P1A-3--0100X twisted-shielded-rtd-wire Twisted-Shielded-Thermocouple-Wire type-b-thermocouples u uncompensated-nickel-plated-copper-wire UX-18527-84 wire-tc-and-rtd Yageo-Nexensos-32208499 Yageo-Nexensos-32208503

Special Offers and Product Education