Type J Thermocouple Extension Cable - FEP Lead Wire with Stripped Ends and Miniature Female Connector
Evosensors
$16.00
SKU: J1X-CAPF-24G-FPSF-6FT-MPCF
![](https://images-async.olark.com/status/5823-593-10-6228/image.png?online=https://cdn.shopify.com/s/files/1/1679/4593/files/george_tech_support_icon.jpg?11070141018481054335&offline=https://cdn.shopify.com/s/files/1/1679/4593/files/george_tech_support_icon.jpg?11070141018481054335)
Type J Thermocouple Extension Cable - FEP Lead Wire with Stripped Ends and Miniature Female Connector
- Extend the Thermocouple Signal from the probe or sensor to your instrumentation without impacting the accuracy of your temperature measurement
- Sensor Connection - a -40 to 400 F (-40 to 200 C) rated Type J Miniature Female connector on the extension cable provides the connection of the Type J miniature male coming from the thermocouple sensor assembly.
- Instrument Connection - stripped wire leads
- Wire Temperature Operating range 32 to 400°F (0 to 200°C)
- Wire Leads - 24 Gage Solid high accuracy SLE grade Type J thermocouple wire with 2 bare wires measuring .020" each (24 gage) in a parallel design individually insulated with FEP or PFA outer jacket.
- Outside jacket dimension .056" x .092" providing a excellent combination of strength and flexibility
- Color Code is ANSI with a white positive wire, red negative wire and brown overall jacket. Connector is black
- EvoSensors Part Number: J1X-CAPF-24G-FPSF-(*FT)-MPCF
- Inset wire footage desired for example 6ft is J1X-CAPF-24G-FPSF-6FT-MPCF and 8ft is J1X-CAPF-24G-FPSF-8FT-MPCF
Consider the following product to enhance your system
Need Help? 407-420-8080
email: info@evosensors.com
email: info@evosensors.com