5 Pack of Type K Thermocouples Fiberglass Braided 30 Gage Solid Wire 80 Inch Long Leads with Stripped Ends
Evosensors
$102.00
SKU: K5X-WBWX-30G-EX-0.25-FGXX-80-STWL
![](https://images-async.olark.com/status/5823-593-10-6228/image.png?online=https://cdn.shopify.com/s/files/1/1679/4593/files/george_tech_support_icon.jpg?11070141018481054335&offline=https://cdn.shopify.com/s/files/1/1679/4593/files/george_tech_support_icon.jpg?11070141018481054335)
5 Pack of Type K Thermocouples Fiberglass Braided 30 Gage Solid Wire 80 Inch (2 Meters) Long Leads with Stripped Ends
- Temperature Range is 32°F to 900°F (0 to 482°F)
- Micro-Sized thermocouple bead is 0.029" (0.7 mm) diameter.(approx. thickness of credit card) provides the opportunity for precise placement.
- Response Time - Less than 1 Second
- Wire Leads are 80" Inches (2 meters or 6.7ft)
- Wire Construction - 30 gage solid 0.010" (0.25 mm) bare wire is a 2 wire parallel design with the wires individually insulated with Fiberglass Braiding along with a Fiberglass outside jacket.
- The overall outside diameter is a nominal .034" x .056".
- Instrument Connection - stripped wire leads
- Applications and Industries include Heat Treating, Metal Processing, Aerospace, Optics, and overall Research and Testing along with many other industries.
- EvoSensors Part Number: K5X-WBWX-30G-EX-0.25-FGXX-80-STWL
Consider the following Accessories to complete your Sensor System
Need Help? 407-420-8080
email: info@evosensors.com
email: info@evosensors.com