Flexible FEP Sealed RTD Sensor 2 Wire Pt100 with 10 to 40ft Long Lead Wire Lengths for Chemical and Wet Applications

Evosensors

$112.00 
SKU: P2A-TF22-26S-PX-PTBC-PFXX-120-STWL

   Call 407 420-8080 or Email info@evosensors.com for Technical and Sales Support
Long Length Flexible FEP Sealed RTD Sensor 2 Wire Pt100 for Chemical and Wet Applications,
  • Temperature Operating range is - 90 to 400°F (-70 to 200°C) 
  • FEP Thin Wall Closed End tube provides protection of exposed temperature sensing element allows immersion into acids, caustics or overall wet agressive enviroments.
    • FEP covering also provides electrical Isolation
  • Pt100 (Platinum 100 ohm) High Accuracy Class A temperature sensor element with .385 Ohms change per 1°C.
  • 2 Wire RTD Accuracycan be Decreased by Long Lengths of lead wire adding resistance to the measurement circuit. A Pt1000 (Platinum 1000 ohm design can compensate for the accuracy issue due to the 3.85 Ohms per degree °C change, a 10 times increase in the resistance as compared to 0.385 for a Pt100 sensor. 
  • Wire Leads - 10ft (120 inches) to 40ft (480 inches) or custom lengths of PFA insulated 26 Gage Stranded nickel plated 2 conductor twisted wire.
  • Color code is 1 White and 1 Red color code on the inner wire and white overall jacket and an overall nominal diameter of .082"
  • Instrument Connection - Stripped Wire Leads
  • Applications - The sensors immunity from electrical interference and FEP encapsulated exposed element is perfect for HVAC, Semi-Conductor and other wet, corrosive or immersion application.
  • EvoSensors Part Number: P2A-TF22-26S-PX-PTBC-PFXX-( )-STWL - enter length of wire lead in inches, for example P2A-TF22-26S-PX-PTBC-PFXX-120-STWL is 120 inches (10ft) of wire leads


Need Help? 407-420-8080
email: info@evosensors.com