Exposed RTD Element Sensor Design 3 WIre Pt100 with 48 Inch Long Leads and Connector

Evosensors

$82.00 
SKU: P3A-TF22-26S-PX-0.08-PFXX-48-MPCT

   Call 407 420-8080 or Email info@evosensors.com for Technical and Sales Support

Exposed RTD Element Sensor Design 3 WIre Pt100 with 48 Inch Long Leads and Connector

  • The RTD Sensor is a 3 Wire Pt100 design with an exposed thin film RTD element and 48 Inches (4 ft) of 3 Conductor Nickel Plated Plastic Fluoropolymer (PFA) insulated 26 gage stranded lead wire with a 3 pin Male Miniature Connector attached.
  • The RTD sensor assembly has a -90 to 500 F (-70 to 260 C) temperature operating range and RTD element is Class A thin film design 
  • The exposed sensor to cable connection is encased with a 500 F rated epoxy potting compound to insulate and further reinforce the transition area.
  • The wire has a 500 F (260C) temperature insulation rating, it is a  twisted construction and an overall nominal diameter of .072”. 
  • The 3-wire design provides a higher level of temperature measurement accuracy as compared to a 2-wire design. The sensors immunity from electrical interference and fast response with the exposed element is perfect for Power Electronics, Transformers, and Motor applications.
  • EvoSensors Part Number - P3A-TF22-26S-PX-0.08-PFXX-48-MPCT

Complete your RTD Temperature Sensor System with the following Products 

  RTD Connector Miniature Three Pin Female RTD Connector Miniature Strain Relief RTD Connector Extension Cable PFA insulated wire with 3-Pin Miniature Male and Female Connector

Need Help? 407-420-8080
email: info@evosensors.com