Silicone Rubber Patch Stick On Surface RTD Sensor - 4-Wire Pt100 with 40 ft Long Lead Wire
Evosensors
$268.00
SKU: P4B-RPAT-REC-PX-1-PFXX-480-STWL
Sorry, this item is out of stock
Silicone Rubber Patch Stick On Surface RTD Sensor - 4-Wire Pt100 with 40 ft Long Lead Wire
- Pt100 4 Wire RTD Surface Temperature Sensor with a Self Adhesive Silicone Rubber Patch and 480 inches (40 FT) of PFA insulated wire with stripped leads.
- Sensor Temperature Range of -50 to 300 F (-50 to 150 C)
- 40 feet (480 Inches) of PFA insulated 500 F (260 C) rated 28 gage stranded nickel plated wire in a 4 wire twisted design with stripped leads.
- IEC Color code of Red and White wire leads.
- The RTD element is encased in the molded Silicone Rubber Patch, the combination of patch material and the PFA insulation on the wire provides a sensor design resistant to Wet and Corrosive environments.
- Instrument Connection is stripped wire leads
- The sensor is an ideal choice for gas and oil piping or storage systems, along with heating and ventilation ducts and many other applications.
- Evosensors Part Number: P4B-RPAT-REC-PX-1-PFXX-480-STWL
Need Help? 407-420-8080
email: info@evosensors.com
email: info@evosensors.com

