Type J Thermocouple Extension Cable - FEP Lead Wire with Stripped Ends and Miniature Female Connector

Evosensors

$30.00 
SKU: J1X-CAPF-24G-FPSF-6FT-MPCF

   Call 407 420-8080 or Email info@evosensors.com for Technical and Sales Support

Type J Thermocouple Extension Cable - FEP Lead Wire with Stripped Ends and Miniature Female Connector

  • Extend the Thermocouple Signal from the probe or sensor to your instrumentation without impacting the accuracy of your temperature measurement
  • Sensor Connection - a -40 to 400 F (-40 to 200 C) rated Type J Miniature Female connector on the extension cable provides the connection of the Type J miniature male coming from the thermocouple sensor assembly. 
  • Instrument Connection - stripped wire leads 
  • Wire Temperature Operating range 32 to 400°F (0 to 200°C)
  • Wire Leads - 24 Gage Solid high accuracy SLE grade Type J thermocouple wire with 2 bare wires measuring .020" each (24 gage) in a parallel design individually insulated with FEP or PFA outer jacket.
    • Outside jacket dimension .056" x .092" providing a excellent combination of strength and flexibility
    • Color Code is ANSI with a white positive wire, red negative wire and brown overall jacket. Connector is black  
  • EvoSensors Part Number: J1X-CAPF-24G-FPSF-(*FT)-MPCF 
    • Inset wire footage desired  for example 6ft is J1X-CAPF-24G-FPSF-6FT-MPCF and 8ft is J1X-CAPF-24G-FPSF-8FT-MPCF

Consider the following product to enhance your system

Type J Miniature Male Thermocouple Connector - Flat Pin Male Plug Design Miniature Thermocouple Connector Accessories 

Need Help? 407-420-8080
email: info@evosensors.com