Flexible FEP Sealed RTD Sensor 2 Wire Pt100 with 10 to 40ft Long Lead Wire Lengths for Chemical and Wet Applications
Evosensors
$111.00
SKU: P2A-TF22-26S-PX-PTBC-PFXX-120-STWL
Long Length Flexible FEP Sealed RTD Sensor 2 Wire Pt100 for Chemical and Wet Applications,
- Temperature Operating range is - 90 to 400°F (-70 to 200°C)
- FEP Thin Wall Closed End tube provides protection of exposed temperature sensing element allows immersion into acids, caustics or overall wet agressive enviroments.
- FEP covering also provides electrical Isolation
- Pt100 (Platinum 100 ohm) High Accuracy Class A temperature sensor element with .385 Ohms change per 1°C.
- 2 Wire RTD Accuracycan be Decreased by Long Lengths of lead wire adding resistance to the measurement circuit. A Pt1000 (Platinum 1000 ohm design can compensate for the accuracy issue due to the 3.85 Ohms per degree °C change, a 10 times increase in the resistance as compared to 0.385 for a Pt100 sensor.
- Wire Leads - 10ft (120 inches) to 40ft (480 inches) or custom lengths of PFA insulated 26 Gage Stranded nickel plated 2 conductor twisted wire.
- Color code is 1 White and 1 Red color code on the inner wire and white overall jacket and an overall nominal diameter of .082"
- Instrument Connection - Stripped Wire Leads
- Applications - The sensors immunity from electrical interference and FEP encapsulated exposed element is perfect for HVAC, Semi-Conductor and other wet, corrosive or immersion application.
- EvoSensors Part Number: P2A-TF22-26S-PX-PTBC-PFXX-( )-STWL - enter length of wire lead in inches, for example P2A-TF22-26S-PX-PTBC-PFXX-120-STWL is 120 inches (10ft) of wire leads
Need Help? 407-420-8080
email: info@evosensors.com
email: info@evosensors.com

