5 Pack of Type K Thermocouples Fiberglass Braided 30 Gage Solid Wire 80 Inch Long Leads with Stripped Ends

Evosensors

$119.00 
SKU: K5X-WBWX-30G-EX-0.25-FGXX-80-STWL

   Call 407 420-8080 or Email info@evosensors.com for Technical and Sales Support

5 Pack of Type K Thermocouples Fiberglass Braided 30 Gage Solid Wire 80 Inch (2 Meters) Long Leads with Stripped Ends

  • Temperature Range is 32°F to 900°F (0 to 482°F)
  • Micro-Sized thermocouple bead is 0.029" (0.7 mm) diameter.(approx. thickness of credit card) provides the opportunity for precise placement.
    • Response Time - Less than 1 Second
  • Wire Leads are 80" Inches (2 meters or 6.7ft) 
  • Wire Construction - 30 gage solid 0.010" (0.25 mm) bare wire is a 2 wire parallel design with the wires individually insulated with Fiberglass Braiding along with a Fiberglass outside jacket.
    • The overall outside diameter is a nominal .034" x .056".
  • Instrument Connection - stripped wire leads
  • Applications and Industries include Heat Treating, Metal Processing, Aerospace, Optics, and overall Research and Testing along with many other industries.
  • EvoSensors Part Number: K5X-WBWX-30G-EX-0.25-FGXX-80-STWL

Consider the following Accessories to complete your Sensor System

8 Channel Data Logger for Thermocouples, RTD's, and Thermistors - Handheld Design with Graphic Interface Type K Miniature Male Thermocouple Connector Miniature Thermocouple Connector Accessories

   

Need Help? 407-420-8080
email: info@evosensors.com