Infrared Temperature Sensor and Transmitter with 4-20 mA Output - Encased in Stainless Steel Protective Housing with Air Purge and 6 Meters (20ft) Long Leads

evosensors

$768.00 
SKU: IRT-CSMA-LT15-SF-3M3M-APSC

   Call 407 420-8080 or Email info@evosensors.com for Technical and Sales Support

Infrared Temperature Sensor and Transmitter with 4-20 mA Output - Encased in Stainless Steel Protective Housing with Air Purge and 6 Meters (20ft) Long Leads

  • Infrared Non Contact temperature measurement capabilities with 4-20 mA output.
  • Temperature Measurement range from – 58°F to 1886°F (-50°C to 1,030°C)
    • Sensor head capable of operating in temperatures from -4 to 248°F (-20 to 120°C)
    • The sensor itself can operate in 10% to 95% relative humidity conditions with ingress protection rating of IP65. The protective housing enhances this performance and has operated in steam and quick freeze applicaitons 
    • Protective Housing Size - Stainless Steel cylindrical housing 2.815" (71.5 mm) length with a 0.993" (25.2 mm) Diameter body tapering to 0.827" (21 mm)
      • Infrared Sensor Body Size encased in the housing is 1/2" (.551" or 14 mm) diameter stainless steel cylindrical housing 1.10" (28 mm) length housing. 
      • Mounting is accomplished with a M12 x 1 thread. A mounting nut is included.
    • Wire Leads are 20ft (6 meters) long with 10 ft (3 meters) from the sensor head to the inline miniature enclosed electronic junction area of the cable and 10 ft (3 meters) of cable to your connection point. 
    • Optical Field of View is 15 to 1 Distance to Spot Size. 
      • At 15 inches the spot size is 1 inch.
      • Spectral range of 8 to 14 µm.
      • Response time is 14 milliseconds
    • System Accuracy plus or minus 1% or 1.8°F (1°C) with Repeatability +/- 0.5 % or 0.9 °F (0.5 °C)
    • Programming Kit provides a terminal block for fast and easy connection from the sensors to a programming cable with mini and standard USB connection capabilities to your PC, laptop, tablet or phone.
      • Download the Windows based Compact Connect Software or IR mobile (Android) app to monitor and or apply process setting and datalogging. 
      • Programming kit part number IRT-CSMLT- APCC
    • Applications and Industry include Machine Builders in diverse industries such as Automation, Food Processing, Paper and Pulp, Electronics, Automotive, Materials, Medical and Energy along with many others.
    • EvoSensors Part Number: IRT-CSMA-LT15-SF-3M3M-APSC
    • Location: J-5-2

    Complete your Infrared Temperature Measurement with the following products

     Infrared Temperature Sensor Programming Connection Kit 


     

    Need Help? 407-420-8080
    email: info@evosensors.com