Micro Type T Thermocouple 40 Gage Fine Diameter with PFA Insulation 10ft (3 Meters) Long Leads

Evosensors

$40.00 
SKU: T1X-WBWX-40G-EX-0.25-PFXX-120-STWL

   Call 407 420-8080 or Email info@evosensors.com for Technical and Sales Support

Micro Type T Thermocouple 40 Gage Fine Diameter with PFA Insulation 10ft (3 Meters) Long Leads with Stripped Ends Termination

  • Temperature Operating range of negative -380 to 500°F (-200 to 260°C).
    • Type T thermocouples can have Excellent Accuracy and Repeatability between negative –380 to 392°F (–200 C to 200°C).
    • Can be (0.5°C to 0.4%) with high accuracy SLE (Special Limits of Error) materials 
  • Exposed Micro-Sized thermocouple bead is 0.013" (0.33 mm) diameter and provides the opportunity for precise placement and a response time of less than 0.25 Seconds.
  • Wire Leads - 120 inches (10ft or 3 meters) of PFA Plastic Fluoropolymer insulated lead wire
  • Wire Construction - 40 gage solid 0.003" (0.076 mm) bare wire is a 2 wire parallel construction with the wires individually insulated with PFA (Plastic Fluoropolymer) along with a PFA outside jacket.
    • Wire overall outside jacket diameter is approx. .017" x .026".
  • Instrument Connection - stripped wire leads
  • Applications and Industries include Semi-Conductor, Electronics, Life Sciences, Aerospace, Optics, overall Research and Testing along with many other industries.
  • EvoSensors Part Number: T1X-WBWX-40G-EX-0.25-PFXX-120-STWL
  • Location: 

Consider the following Accessories to complete your Sensor System

Miniature Thermocouple Connector Accessories Miniature Male T Calibration Thermocouple Connector Type T Miniature Female Thermocouple Connector Handheld Thermometer with Dual Thermocouple Inputs

Need Help? 407-420-8080
email: info@evosensors.com