Type K Thermocouple Fine Diameter Extension Cable 5 ft Long Leads with Miniature Female Connector and Stripped Ends

Evosensors

$10.00 
SKU: K1X-CAPF-30G-SLXX-5FT-MPCF

   Call 856 579-7490 or Email info@evosensors.com for Technical and Sales Support

Type K Fine Diameter Thermocouple Extension Cable 5 ft Long Leads with Miniature Female Connector and Stripped Ends

  • Extend the Thermocouple Signal from your fine diameter sensors to your instrumentation without impacting the accuracy of your temperature measurement
  • Sensor Connection - a -40 to 400 F (-40 to 200 C) rated Type K Miniature Female connector on the extension cable provides the connection of the Type K miniature male coming from the thermocouple sensor assembly. 
  • Instrument Connection - stripped wire leads 
  • Wire Temperature Operating range -328 to 500°F (-200 to 260°C)
  • Wire Leads - 5ft (60 inches or 1.5 meters) of high accuracy SLE grade Type K thermocouple wire with 2 bare wires measuring .010" each (30 gage) in a parallel design individually insulated with PFA and outer jacket.
    • Outside jacket dimension .022" x .038" providing light weight and excellent flexibility
    • Color Code is ANSI with a yellow positive wire, red negative wire and clear overall jacket. Connector is yellow  
  • EvoSensors Part Number: K1X-CAPF-30G-SLXX-5FT-MPCF 
Need Help? 856-579-7490
email: info@evosensors.com